Calculate Time Between Start Time And End Time?
Feb 7, 2014
the vendor has a 21 hr working window; start from 7am and goes until 4am; Mon to Fri.
Here is a scenario:
- i request for a product information from a vendor on 3-Feb-14 8:00am (Monday)
- he replies with all of the product info on 6-Feb-14 12:00pm (Thursday)
can you find the time in above scenario consideration the working window?
Here is another scenario:
- i request for a product information from a vendor on 6-Feb-14 8:00am (Thursday)
- he replies with all of the product info on 11-Feb-14 12:00pm (Tuesday)
- Sat & Sun are days off but keep in mind that my Friday shift ends on sat at 4am so the networdays formula wont work.
View 2 Replies
ADVERTISEMENT
Jun 19, 2014
I have a userform that time stamps on my userform as soon as i open the form, is there a way that when I submit, that the amount of time that I was on the call to be put in my column on my worksheet as minutes?
View 2 Replies
View Related
May 3, 2008
This may be a bit vague but here goes.
I have to calculate the difference between the start time and end time of a job. The only catch is, how can I avoid calculating "out of hours" time. So, if a job goes from 9am to 9am the next day, I want it to avoid calculating between the hours of 23:30 and 03:30.
Another example is if a job goes from 02:00 to 04:00, I want it to avoid the tim between 02:00 and 03:00.
If there is a difference in days, so the job goes overnight, how do I take that into consideration also.
View 9 Replies
View Related
Dec 19, 2008
I have a worksheet which contains START TIME in column A, then TIME USAGE in column B and END TIME in column C. User enters start time, followed by the number of time usage in minutes, how could i possibly display the end time automatically in this scenario? how do you add the entered time usage to the start time to display the end time? Say if I enter 1:00 AM at start time and 00:15 minutes on time usage, how can 1:15 AM be displayed on the end time automatically?
View 2 Replies
View Related
Mar 3, 2009
I am trying to provide a tool for department leaders to monitor productivity for order processing in their departments. The variables I have are: Number of orders(variable), number of pickers (variable), start time(variable). Then, I know each order takes 1 picker 4 minutes to pick on average, and there are 45 minutes worth of breaks during the picking process. So after entering the variables I used =(((C3*4)/60)/D3) to come up with the time needed to process the orders. What I can't get to is how to add this number to the start time, factor in break minutes and get to the projected completion time. I have Excel 2003 at work. Clearly I need to take a class!
View 4 Replies
View Related
May 5, 2006
I have a user form with textBox1 = start time (entered as "[h]:mm") and text Box2 = finish time (entered as "[h]:mm"). I would like textBox3 to display the difference between the start time and finish time as a general number!
For example
Start time: 21:00
Finish time: 06:30
Hours worked: 9.50
Start time: 12:30
Finish time: 23:00
Hours worked: 10.50
View 9 Replies
View Related
May 23, 2007
how to include a line of code, to start a sub running at a selected time? Given that the workbook is already opened before that time?
View 6 Replies
View Related
Dec 25, 2007
Can I adapt this code so that users receive the alert if they try and go to the next field without filling in the required ones, or - better - to combine it with a code that does not run a macro, but instead gives the alert, if the required fields have been missed. (I don't require anything to do with printing, this was the closest code I could find)
Private Sub Workbook_BeforePrint(Cancel As Boolean)
If Sheet1. Range("A1").Value = "" Then
MsgBox "Cannot print until required cells have been completed!"
Cancel = True
End If
End Sub
View 4 Replies
View Related
Sep 25, 2009
I have a workbook that is generated from the system(AS400)but it wont subtract the time finish -time start. I get a #Value error in the cells I tried two different formulas.
View 2 Replies
View Related
Nov 14, 2006
I want to copy and paste a PARTICULAR RANGE from one workbook to another workbook. I want to select the data range from "09:55:00" to "10:00:00" which is in the cells in Column "A" an copy paste it to another workbook. The rows are not constant. The data "09:55:00" to "10:00:00" can e present on any row but is present on the same column i.e "A".
View 2 Replies
View Related
Feb 27, 2010
Is it possible to calculate hours if both the start and end time are in the same cell. Unfortunatly the developers of our scheduling program developed it so when you export the schedule to excel it shows Greg in A1 and 3:00pm-9:00pm in A2. I would like to have excel calculate the 6 hours so I can use it to auto generate another spread sheet I am making.
View 10 Replies
View Related
Mar 13, 2014
I have a small project at work where I am being asked to put a simple spread sheet that will calculate a start/stop time - and also include the date. For example:
Start time 5pm, date: 3/13. The spread sheet to auto calculate what the stop time and date will be if a specific amount of hours is to be calculated. For example in this case, 12 hours. From calculating in my head that would be 5am the following day. However, how can I get this in excel to work and therefore all i would have to do is enter the start time and date, + 12 hrs, and excel would calculate the time/date after the additional 12 hrs.
View 3 Replies
View Related
Dec 13, 2013
test.xlsx
I need to calculate the time elapsed between start and finish dates. I've figured the TODAY function, as explained here but I'm referring solely to dates in cells. How to?
View 1 Replies
View Related
Mar 6, 2014
I am trying to calculate the average start time for a machine over a period. However the machine start time varies from 10:00 pm to past midnight. I have tried reviewing past posts but cannot seem to find a similar query.
View 13 Replies
View Related
Feb 28, 2013
I can calculate total hours when a user enters a start date/time and a finish date/time. The kick is I only want to include hours from 2:00 PM to 12:00 AM (10 hour period). So assuming all the start and end times will be in this range, how can i calculate work hours over multiple days? For example: Start date/time = 2/26/13 2:30 PM and end date/time = 2/28/13 10:30 PM. I want my calculated hours to show 28 hours.
View 1 Replies
View Related
Mar 8, 2014
production01.png
I am trying to figure a way to search for a cell that has a specific date and time range. There are several cell titles pending on the activity. I want to find a cell that has a time ** 7:30-15:30 , 15:31-17:30, 17:31-20:30. The end result is to calculate the activity between those time periods based on the data cells.
Example
If the date searched time field ** the activity ranges is 1635 I need to split the time and credit the activity time in the 730-1530 time and the rest on the 15:31-17:30 time
I have been able to do it on a single labor group based on time alone, but when I try to add the DATE to it my numbers go null. Eventually i will need to add 11 labor groups daily for weeks at a time .
Excel 2007
View 3 Replies
View Related
Apr 27, 2014
Formula to calculate time allotted minus time used and show the difference in hour and minute.
View 1 Replies
View Related
May 8, 2014
How to find the elapsed time between two times, but I need the start time in this instance.
Attached is my spreadsheet for a callcenter in which has exported data showing what time the data is exported and how long someone has been their state if they are out of adherence. I have selected fields explaining what I am wanting where on the spreadsheet.
I am wanting to subtract the elapsed time in MM:SS from the End Time which is in HH:MM AM/PM (Imported as text). I do not mind moving these to separate cells to the left to format them correctly, I want to be able to right click in A1, paste, and the rest trickle.
I am having difficulties subtracting the time to get the start time.
Time Conversion (IEX Import).xlsx
View 5 Replies
View Related
Mar 3, 2009
I have four different times on my report, enroute, on scene, clear of scene, in service. I need to make sure that the user's input for each time is < or = the previous time. Also I would like for my time to show in 24 hr format. Do I need to change my clock or can I do it without changing the clock format. users will use the CTRL +SHIFT+: to insert the current time
View 2 Replies
View Related
Feb 6, 2008
I'm not getting that early in the morning
In A1 I've the start time
In B1 I've the end time
in C2 I have a time value ie 6:30 AM
I need a formula IF C1 is between the start time and end time to return the value 1 and if not to return 0
View 2 Replies
View Related
Aug 28, 2009
I am wanting to calculate the the processing time for an order that takes place within normal business hours and workweek. A normal day is from 8:00 to 5:00 If a task is started at 2:00 PM Monday and finished at 10:00 AM Tuesday then the result should be 5 hours as I do not want to include any time outside of normal hours. I can figure out how to subtract dates and times but not how to bridge a day(s). My data is somewhat flexible as I have not started the project yet. I can use separate cells for the times and dates or have two cells that use both incorporate the date and time (8/27/09 2:00 PM) for start and end time or any other idea.
View 6 Replies
View Related
Jul 1, 2012
I have a problem here:
Eg.
A B C D E F G H I
1 8 pm 9 pm 10 pm 11 pm 12 am 1 am 2 am
2 8 pm 11 pm
3 8 pm 2 am
I typed a formula : =if(and(c$1>=$a2,d$1
View 4 Replies
View Related
Sep 11, 2009
I need to determine a formula which will allow me to calculate a future date based upon a current date with varying time periods.
For example:
I have a bill which is paid on the 15th and last business day of each month. I would like to be able to see the next due date regardless of what day of the week it is.
I have a bill which is paid every other Tuesday. I would like to know the next due date without having to enter +14 for every due date in the future. In other words, it is preferable to be able to open the spreadsheet and automatically see the next due date, not use autofill to repeatedly add +14 to a previous date which would limit the # of future due dates that could be calculated.
I have a bill which is paid on the last business day of each month, not the last Friday of each month. I would need excel to return a value for the last day of the month which = Monday-Friday, regardless of what day of the week it may be as long as it isn't Saturday or Sunday(holiday exclusion would be nice but not required).
View 14 Replies
View Related
May 17, 2014
I found this formula similar to other formula
NETWORKDAYS(D1,F1)-1)*"18:00"-"9:00")+IF(NETWORKDAYS(F1,F1),MEDIAN(G1,"9:00","18:00"),"18:00")-MEDIAN(NETWORKDAYS(D1,D1)*E1,"9:00","18:00")
By the way ....D1 = start Date
F1 = End Date
E1 = start Time
G1 = End Time
It's GREAT! But now I need include time from 6:00 a. m. to 10:00 p. m. (I already modified your formula:
(NETWORKDAYS(D1,F1)-1)*("22:00"-"6:00")+IF(NETWORKDAYS(F1,F1),MEDIAN(G1,"6:00","22:00"),"22:00")-MEDIAN(NETWORKDAYS(D1,D1)*E1,"6:00","22:00")) because are regular working hours in Colombia but:
1. All the days (Monday to Saturday) are working days
2. I just want to calculate the time in shifts, I don't specify the start date and end date. Example: 8:00 p.m. to 11:00 p.m. Result: 2 hours, because 1 hour is after 10:00 p.m.
This are two different options, so I need two separate formulas.
View 10 Replies
View Related
Aug 16, 2008
I've got a time difference from 8:00AM - 12:30PM as 4.30 I'm trying to get the minutes, .30, converted into a 6 minute increment, .5. Is it possible to do this and if so how would it be done? Below is a chart of how the time is converted from 6 minutes increments into decimal form.
6 = 0.1 36 = 0.6
12 = 0.2 42 = 0.7
18 = 0.3 48 = 0.8
24 = 0.4 54 = 0.9
30 = 0.5 60 = 1.0
View 5 Replies
View Related
Aug 11, 2006
I'm trying to devise a formula to produce "days in inventory" based on the following data:
Date In
Date Out (which may be blank if cargo still here)
Todays Date
Days in Whse (which is the formula I can't figure out!)
It needs to work like this, date out - date in, unless date out is null. If date out is null, the result should be calculated based off of todays date - date in.
View 3 Replies
View Related
Feb 5, 2009
I need to calculate the time spent replying to my inquiries: I log the time I receive my inquiry as: 06/02/2009 09:23:00 in column A. I log the time I send my reply as: 07/02/2009 07:23 in column B. In column C, I need to put the Formula that will return the following result: 0 days 22.0 hours.
View 5 Replies
View Related
Jun 11, 2008
ABCDEFGH11-Jun-08123412:30 PM12:32 PMHi GuyI want Date and Time should appear automatically when I entera number in C1 column I have certain conditions I need to capture the start time and end timecan you help me in this For example When I enter a number in C1 column the date must automatically appear in A1 column like wise I need start time must come automatically in D1 column when I move or use tab key to next column E1 the end time should come in E1 colcan you help me in this as shown in the above exampleI need this as soon as possiable
View 9 Replies
View Related
Nov 23, 2012
I have a set of call data including start time and end time, with all calls on the same date. Now, how would I show in a sepearate column the concurrent calls being made. i.e how many calls are being used at the same time. This relates to how many channels I can suggest to someone with the maximum concurrent calls being made.
I have attached someConcurrent CaConcurrent Calls sample.xlsxsample.xlsx sample data.
View 3 Replies
View Related
May 1, 2008
I get the following VB pop-up every time I start Excel 2007 (I can't easily find a way to paste an image here, so plain text is used):
Microsoft Visual Basic
Run-time error '-2147467259 (80004005)':
Method 'Add' of object 'CommandBarControls' failed
Continue End
I suspect it's a keyboard shortcut for launching some other application that is in conflict with an Excel shortcut, but I can't debug, so I can't determine this.
Excel opens up fine when I click End.
View 9 Replies
View Related