Can I calculate the number of working hours between these two using a formula? So if I have a 10 hour working day (08:00-18:00), Mon-Fri and the two Dates/Times can I calculate the number of working hours?
I am trying to subtract from a collumn 14 seconds from the time that is in the cell. I do not want to manually enter in a formula, or copy and forula into the cell as there is a large amount of data for this. The report will be updated daily and will need to always subtract 14 seconds from the time, and the result should be populated in the cells that the time is subtracting from.
I'm trying to subtract two times to get the difference. Entries are in military format (1615) and VBA converts the time to 16:15. My problem is that when a time is entered between 0001 and 0059 (i.e. 0015), the VBA converts the time to :15. My formula does not recognize this, but does recognize 0:15 (entered without VBA). The cell is custom formatted as h:mm. I've tried several other formats including [h]:mm but can't get any to work. How can I get a formula to recognize it?
I get a spreadsheet downloaded to excel with a variable of 15 names.
I want to create a formula that if the name Cleardale appears to take the time responding in cell BD and subtract it from the time available in cell AV so that I have the time on task and then to add up all those times in a total time on task for all cleardale listings for that day. The times are listed in the 24 hour format. I keep getting errors. Can anyone help me out on this one? The range of the cells is from AV7 to AV500 for available time and BD7 to BD500 for alert time and the range of the names is cell f7 to f500.
I have created a userdefined function. the Idea is for the user to calculate the difference in hours and minutes. The input would be like budtime = 30 , realtime = 1.25 the answer I would like to have is 28:45 (28hours and 45 mins). Im aware that I can format the cell manually with [h]:mm but I'd like the function to do it. I have written this:
Function RT(BudTime, RealTime) RT = Format(((CDec(BudTime) - CDec(RealTime) / 24)), "[h]:mm") End Function
I have a data which has a start time, end time, Stay Time(End-Start) and # of subjects. I am trying to create a graph, line, bar or histogram which shows how many subjects were there at a specific time. So the horizontal axis would have time from 00:00 to 24:00 and vertical axis would have the total # of subjects or the %.
Seems that when I subtract a future date from NOW() and format the cell d:hh:mm that the result is 1 day off. So if I subtract NOW() (today is 10/24) from 10/25/08 it returns a 1 for the d when I would expect it to be zero.
I have 2 cells in a row that are times, it has been a while since I did any work in excel. I want to take the first cell as start Time, the second cell is end time and I need to subtract them and put the total in a cell called Hours. What is the correct format to use and how would I do the subtraction.
Generally start time will be AM and End Time will be PM.
I have a user form with textBox1 = start time (entered as "[h]:mm") and text Box2 = finish time (entered as "[h]:mm"). I would like textBox3 to display the difference between the start time and finish time as a general number!
For example Start time: 21:00 Finish time: 06:30 Hours worked: 9.50
I am attempting to create a datasheet to track the actual time an agent takes a break or lunch. Here is an example of the data that I am using.
name Date Lunch Sch Brk1 Sch Brk 2 Actual Time BrandonHolt8/19/201411:10 8:30 1:20 8:24:20 Break BrandonHolt8/19/201411:10 8:30 1:20 11:42:34 Break BrandonHolt8/19/201411:10 8:30 1:20 12:57:46 Lunch
Because I have two break times, possibility of more depending on the agent, how do i create a formula that will look at this data, take the schedule time for say break one and only apply that against the time that is more in line with the closest actual time?
I'm currently working on a rota for which I would like the worksheet to automatically tell me how many staff members I have beginning their shift before 9am and those finishing after 7pm. I currently have this working via a very crude set of IF statements for each staff member for each day of the week, returning 1 if true and 0 if false. Then I have a sum statement at the bottom of each day. Is there a much tidier and simpler way for me to calculate this?
I've attached the worksheet. A quick note is in Q52.
I am trying to create a time sheet where there will be a start time - end time - number of hours (difference between the 2) - pay rate - total pay, but am getting strange results!
I have a spreadsheet with 4 columns - Start Date, Start Time, End Date and End Time. In the 5th column, I need to fill in the "Duration" which is calculated as follows :- Duration = (End Date,End Time) - (Start Date,Start Time)
I need to find out the total movement in start times per week for the employees.
I have used MIN and MAX to find the earliest and latest start times, and then a subtraction to find the difference.
This works brilliantly until my employees who start around midnight.
If they have started before and after midnight, it takes midnight as the earliest time and 23:00 as the latest, giving a difference of 23 hours instead of 1 hour.
i.e.
Start Times 23:00, 23:15, 00:15, 00:30
Range of Movement 00:30 - 23:00 = 01:30
I've tried, =$B$9+($C$4>$B$9)-$C$4 but this does not work when the MIN reads 00:00.
It's been several years sine I had to look at calculating amount of time worked. Can you please look at this old spreadsheet of mine and verify that the formula is correct?
It appears to be ok to me, but I don't want any errors when it comes to paying my employees
I am trying to come up with a formula that calculates total time someone has worked in a day. The scenario is an individual will work at a home and start working with an individual. Their start/end times look like this in a pivot:
Min Start Max Start Min End Max End Location A+Counselor A 8:56 AM4:01 PM 1:11 PM 7:00 PM Location A+Counselor B 12:00 AM 8:00 PM 6:00 AM 11:59 PM Location B:Counselor C 7:00 AM 12:00 PM 2:00 PM 4:00 PM Location C+Counselor D 8:00 AM 8:00 AM 4:00 PM 4:00 PM
Some people work split shifts while others work a straight shift. The formula I created was this:
=IF(OR(B9=C9,E9=D9,D9=C9),E9-B9,IF(D9>C9,((E9-D9)+(C9-B9)),IF(C9>D9,((D9-B9)+E9-C9),"New Formula Needed")))*24
(I use a pivot table to show max min for start and end times)
This works great except for the individuals that have multiple punches during the same time frame. The one scenario I am having trouble solving for is when someone punches in more than once during their shift displaying. This occurs when a counselor starts a shift working with one person but then adds another person mid shift. An example of this could be:
Location A+Counselor E Min Start Max Start Min End Max End Consumer 1 1:00 PM 1:00 PM 8:30 PM 8:30 PM Total Time: 7.5 Consumer 2 12:00 PM 12:00 PM 2:35 PM 2:35 Pm Total Time: 2.6
Pivot says that they worked a total of 10.1 because it is grabbing the max and mins and calculating. The actual total time worked is 8.5 hours in reality.
The raw data comes in like so:
Location Counselor Consumer Start Time End Time A A A 1:00 PM 8:30 PM A A B 12:00 PM 2:35 PM A A C 12:00 PM 5:00 PM
I want the start and end times of the shift to turn black or red depending on whether the adjacent cell says "off" of "Hol" respectively. I have this working except for when I actually enter smething into these cell ie a shift, the cell turns black.
I have a workbook that is generated from the system(AS400)but it wont subtract the time finish -time start. I get a #Value error in the cells I tried two different formulas.
I am trying to find a formula that will return the number of week days between two dates. My specific situation is that my job sets up work orders (WO) to be completed by our staff. We have 3 dates - the date the WO was created, the date the WO is due to be completed, and the date the WO was actually completed.
I would like to subtract the Complete date from the Due date. Generally, this should always equal zero because our staff should be completing WOs on the due date! But obviously that doesn't always happen. There are times that they complete them late, and times they complete them early (yay!).
The problem with NETWORKDAYS is that even when they are completed on time, the result is 1. This formula counts instead of subtracts. I adjusted the formula to =NETWORKDAYS(A3,A4)-1 which works fine for those WOs completed on time or completed late. But for those completed early, it adds (or subtracts, really) 2 days. So for a WO completed a day early, instead of it showing -1, it shows -3. I've attached an example of WOs and the NETWORKDAYS formula I've used so you can see.
Subtract Days.xls
I'm really looking for something that will subtract week days, not count them.
I need to compute the no. of days between start and end dates and spread no. of days on each month. I've attached a spreadsheet with examples and further explanation.