Providing A Start And Finish Cell Into A Range

Jan 23, 2007

I need to create a range of cells in Column A. I know the first cell, A2. The final occupied cell will vary. Once I have the range object I would like to step through and analyse each cell in turn using a For/Each loop.

The code I have so far is:

Public all_structures As Range 'Range required for for/each loop Column
Public last_structure As Range 'Last cell in Column
Public molcell As Range 'Current cell in range

' Establish range of cells in Column A

Set last_structure = Range("A2").End(xlDown)
Set all_structures = Range(Range("A2"), Range(last_structure)) ***

' Loop through each structure in turn
For Each molcell In all_structures

Loop code In here

Next molcell

When I run I get an error message of "Run-time error '1004': Method 'Range' of object '_Global' failed". It does not like the line marked ***.

View 3 Replies


ADVERTISEMENT

Return Start And Finish Date?

May 25, 2014

I am trying to return start and finish date of events depending on when resources are allocated.

View 4 Replies View Related

Get Start And Finish Time For Breaks / Lunch?

Apr 15, 2014

I am trying to get the start time and finish time for breaks.

I have 4 columns Name, status, start, finish. In the name column there are multiple names, under status there 6 different status's. and under the time columns there are in and out times dependant on status. I am trying to us index match match. I have tried vlookup and hlookup as a nested function. I keep getting errors.

NameStatus MessageStart TimeFinish Time
Cameron WilliamsTech All & Billing12:31:4812:31:52
=index(starttime,match(name,namefield(match,"on lunch",starttime)))

[Code]......

View 1 Replies View Related

Mark The Hours On A Start And Finish Time

Mar 25, 2014

I am working on an excel spreadsheet for work and I have to show a chart that shows the time of day a space is in use. Right now I am having to mark all of these by hand which takes me forever because I have a couple thousand lines of information.

I need to mark the hours in use based off the start and finish time.

For Example:
1) If the start time was 7:00 and the end time was 10:45 then the markers would only mark 7am and 10am
2) If the start time was 7:15 and the end time was 10:00 then the markers would only mark 7am and 9am
3) If the start time was 7:30 and the end time was 10:30 then the markers would only mark 7am and 10am
4) If the start time was 7:45 and the end time was 10:15 then the markers would only mark 8am and 9am

I was given the formula and it works to count the whole hour but now I need the formula tweaked and I don't know how...I need the formula to account for quarterly hours...and I don't know how to fix it.

Attached is an example of the spreadsheet of what I currently have and of what I need. Book1.xlsx

View 2 Replies View Related

Calculating Start And Finish Times For A Process

Feb 22, 2010

I have a number of processes that I would like to calculate the finish times of.

For example, Process A may take 18 hours to complete, Process B may take 28 hours to complete and Process C may take 125 hours to complete etc

However these processes only run during certain times, i.e. 9am to 5pm.

Ideally I would like to setup a spreadsheet that when given the start time and process time calculates the (date and) time the process will finish.

I can get it to work on a 24 hour day but I've been tearing my hair out trying to take out the none-working part of the day (the 5pm to 9am).

View 9 Replies View Related

Calculate Time Elapsed Between Start And Finish Dates

Dec 13, 2013

test.xlsx

I need to calculate the time elapsed between start and finish dates. I've figured the TODAY function, as explained here but I'm referring solely to dates in cells. How to?

View 1 Replies View Related

How To Calculate Work Hours From Only A Start And Finish Date And Time

Feb 28, 2013

I can calculate total hours when a user enters a start date/time and a finish date/time. The kick is I only want to include hours from 2:00 PM to 12:00 AM (10 hour period). So assuming all the start and end times will be in this range, how can i calculate work hours over multiple days? For example: Start date/time = 2/26/13 2:30 PM and end date/time = 2/28/13 10:30 PM. I want my calculated hours to show 28 hours.

View 1 Replies View Related

Number Of Working Hours Between 2 Dates Including Start And Finish Times

Mar 22, 2007

I have 2 dates+ times.

1 the contract start date and time.

2 the contract end date and time.

Can I calculate the number of working hours between these two using a formula?
So if I have a 10 hour working day (08:00-18:00), Mon-Fri and the two Dates/Times can I calculate the number of working hours?

Example
Start 06-Mar-07 10:00
End 14-Mar-07 14:00

This is 2 part days and over a weekend.

View 9 Replies View Related

Automatically Populate 12 Month Calendar With Result Depending On Start And Finish Dates

Mar 26, 2014

I've just started working on an FTE calculator and wish to populate a 12 month calendar with FTE depending on the start and finshed dates.

FTE Calculator non nursing.xlsx

I've attached the file. In Column D the user would select the month the staff start and in the Column E the month the staff will finish. I would like the fte that is calculated in Column Z then to populate in the 12 columns AB:AM (Jul to Jun) with corresponding month start and finish.

View 2 Replies View Related

Subtract Start Time From Finish Time Return Hours Worked As Number

May 5, 2006

I have a user form with textBox1 = start time (entered as "[h]:mm") and text Box2 = finish time (entered as "[h]:mm"). I would like textBox3 to display the difference between the start time and finish time as a general number!

For example
Start time: 21:00
Finish time: 06:30
Hours worked: 9.50

Start time: 12:30
Finish time: 23:00
Hours worked: 10.50

View 9 Replies View Related

Calculate Start Date From Finish Date Minus 14 Working Hours

May 7, 2014

I needs a formula (not VBA) to calculate the required start date.

I have to do a job of 14 working hours and this job must be finished on 05-may-2014 13:00

My working week is from monday u/i friday and every day I work from 08:00-16:00

At what time do I have to start the job to get it done in time.

The formula should give this result: 01-may-2014 15:00

View 3 Replies View Related

Subtract The Time Finish & Time Start

Sep 25, 2009

I have a workbook that is generated from the system(AS400)but it wont subtract the time finish -time start. I get a #Value error in the cells I tried two different formulas.

View 2 Replies View Related

Dynamic Range. Start & End Cell Not Known

Jul 13, 2007

I would like to create a dynamic range of numeric type in a single column. Only the precise position of one middle cell is known, let's say $A$20, but the range is supposed to extend above and below $A$20 and to finally include all adjunctive, positive and negative numbers in that very column.

Having read the ozgrid-resources on dynamic ranges let me experiment with the following line, however, it seems to include all entries in the column disregarding the format type or the fact that they should all be adjunctive (meaning that wherever there's a text entry it should be seen as the natural end of it): ....

View 7 Replies View Related

Start Function Range Reference Row From Cell Value

Feb 28, 2008

Is there a way to start match from a relative position?

Say a match I have in column "A" returns 344. Is it possible to start a new match for column "B" from that spot, instead of having it return a match starting at the top?

View 5 Replies View Related

If Statement Providing Incorrect Answer?

May 20, 2014

In cell K8 is the value (General) 800. In C8 is the value (Also general format) 768.

=IF(C8

View 4 Replies View Related

Sumif Is Referencing Blank Cells And Providing A Value

Oct 14, 2009

How do I get 'SUMIF' to ignore blank cells? sumif(a1:a10,h1,b1:b10) - then fill down

a= ID number
h1 = ID number
b= cost info

eg 'matt' in 'h' is finding 'matt' in 'a' and reporting on the cost info against that name in 'b', but in the middle of the list a blank is matching a blank and returning a subtotal which is in the cost column. I want to put sumif(a1:a10<>"",h1, b1:b10) but this doesnt work!

View 2 Replies View Related

Cutting Down List And Providing Number Of Duplicates?

May 21, 2013

I'm pulling data from my servers (alarms) and have roughly 10 alarm points, reporting 9000 alarms. I've been able to pull them off the server on an excel file, have been able to sort them, but would like to venture into the hope that there is some sort of formula that would take the duplicate alarms(cell a1-a9000), delete them, and report how many duplicates were removed from the list in cell b1-b10

xyz
xyz
xyz
xyz
123
123
zzz

---

somehow it could be turned into
"xyz 4"
"123 2"
"zzz 1"

View 3 Replies View Related

Formula That Points To Another Cell With Formula To Finish First One?

Mar 5, 2014

I'm wondering if it's possible to write a formala that if a certain condition is met, performs a formula referenced in another cell. For example: Column A contains a list of formulas. In column B is the condition, let's use Work Type as an example. The result (or the formula I need) would be in column C. So if the work type is "Type1", then the formula in the corresponding column C cell would perform the formula in cell A5. If the work type is "Type8", then the formula in the corresponding column C cell would perform the formula in cell A2.

Is this possible to do without VBA?

View 6 Replies View Related

How To SUM A Range With Variable Start And End

Oct 5, 2012

How to sum using variable start and end points?

For example,

Column A is the list of start dates, and Column B is the list of end dates to be used at the variables.
Column C is a list of dates, and Column D is the corresponding temperature data to Column C.

What I would like to do is create a new column (E) that sums the temperature data from Column D based on the start and end dates from Column A and B respectively (these dates to be used to match the dates in Column C).

View 6 Replies View Related

Return Max Finish Date For Projects Using VBA

Aug 14, 2014

I have a spreadsheet containing milestones for several different projects. The number of milestones per project varies.

I need to get the max date for each project using VBA.

Simple Example: 'Project Name' is in column A and the 'Scheduled Finish Date' is in column B.

Project X has 5 milestones with the following Scheduled Finish Dates: (8/15, 8/16, 8/17, 8/18, 8/19) Project Y has 3 milestones with the following Scheduled Finish Dates: (8/20, 8/21, 8/22) Project Z has 6 milestones with the following Scheduled Finish Dates: (8/23, 8/24, 8/25, 8/26, 8/27, 8/28)

I need the macro to return 8/19 for Project X, 8/22 for Project Y and 8/28 for Project Z.

View 6 Replies View Related

VLookup To Start At The Bottom Of Range Instead Of Top?

Dec 17, 2012

2012PlayerStats.sample1.xlsx

I have a list of players and the team they play for in Columns A and B.

In column E I have created a list of only unique names and in F I need the Team the played for last. However with Vlookup I am only getting the team they played for first. How can I get the team they played for last?

I have tried vlookup and index/match and get the same.

View 3 Replies View Related

Copy Data From Start To End Range

May 2, 2009

can anyone help me how to create a macro which will copy range of data based on a criteria? I have a worksheet which contains dates on column C rows C30:C64, dates would start from march 29 to may 2. how can I copy the range of data from April 1 to April 30? the criteria which will be copied will always be the start of the of the month up to the end of the month...meaning if the dates placed is like April 26 to June 6, it would automatically extract the range for May 1 to May 31 and place this on another sheet.

View 6 Replies View Related

Define Range Start And End Using Comboboxes

Jan 25, 2012

I have a daily collection of data based on half hour meter readings. Responsibility for this data is to be split between core and non-core hours so for example core hours would be from 6:00 to 18:30.

What i would like to do is have a combobox for both the start time and end time allowing the user to change these as appropriate.

Where i'm struggling is using these comboboxes to select the data between these two times and total the values per row.

My data is currently arranged with the times (staring at 00:00) running horizontally on row 14.

View 9 Replies View Related

Sum Dynamic START And End Range In Column L?

Apr 9, 2014

I am using the below code to sum from "L2" to LastRow2

Code:
LastRow2 = ActiveSheet.Range("L6500").End(xlUp).row
LastRow3 = ActiveSheet.Range("L6500").End(xlUp).End(xlUp).row

Cells(LastRow2 + 3, 16).Formula = "=SUM(L2:L" & LastRow2 & ")"

How can I replace “L2” with “LastRow3” which is a dynamic starting point for the range sum?

View 5 Replies View Related

Open Excel File By Providing Part Of File Name Through Inputbox

Feb 11, 2014

I need a VB code to open excel files located in a path (fixed path) by providing a part of file name through a input box
for ex: I have some files located in my local drive as below

1. colurgreen.xls
2. colurred.xls
3. colurblue.xls

I need a input box asking for file name and I input "green" or "red" or"blue" and it should open the resp file.

View 4 Replies View Related

Range Selection From Variable Start Point

Dec 31, 2008

I'm trying to write a bit of code that will allow me to clear some sheets. One of the sheets has formula for x number of rows, and these need to be left intact. Under these forumla there is an area where data is pasted, and this needs to be cleared becfore starting the process.

Colum A is blank, apart from cell A1 (the column heading) and another cell (variable row) with the value 'Paste here'. I've used this variable cell in other macros on the sheet as a marker, so need this to stay. I was going to use this code below, but I don't know how to tell it to select from the current active cell to the bottom of the spreadsheet.

View 5 Replies View Related

Automatically Fill Numbers If Start And End Range Is Known?

May 27, 2012

Any macro or a VB script to fill the numbers in between the "start" and "end" range . The only input that will be provided is the start and end of the range.

For example if the start = 100 000 and end = 100 010.

The output should be

100 000
100 001
100 002
100 003
100 004
100 005
100 006
100 007
100 008
100 009
100 010

View 9 Replies View Related

Return Range. Offset From Start Point

Dec 15, 2006

I need help in simulating the functionality of the OFFSET function with some of standard Excel functions which are shown at this webpage (I will be using this converter to generate the webpage from the sheet):

Spreadsheet Converter Supported Functions

I ask this because I need to create an interactive online calculator which absolutely needs to have the ability to allow the user to select the RANGE of the data to be analyzed. I included an example sheet with the offset function in the pink cellDo you think any other standard excel function can be used to simulate its functionality?

View 9 Replies View Related

Automatically Start Macro On Any Change To A Specified Range

Jan 19, 2008

Within range Sheet1!D4:D423, how can I have a macro called RestartClock start any time the Enter key is selected within a cell for that range?

View 7 Replies View Related

Employee A Date Line Of Time Of When Pieces Should Be Finish

May 29, 2014

1-The employee takes 13 minutes to build each piece

2-The employee starts at 7:15 am

3-The employee goes to lunch from 12:15 pm to 1:00 pm

4-I need to give the employee a date line of time of when pieces should be finished. Taking into account the time he/she takes lunch.

View 2 Replies View Related