Calculate Wave Time Cycle

Sep 24, 2007

how to calculate in data serie cyles the:

- Mean Amplitude

- The Time (minutes) cycle between Maximum and Minimum cycle values (If the Cycle value X Amplitude)

- Cycle Mean Time.

View 9 Replies


ADVERTISEMENT

Calculate A 24 Hour Cycle Time Which Excludes Weekends And Public Holidays

Mar 16, 2009

I would like to find out if a job took more than 24 hour cycle time (eg. 6:00 am to 5:59:59 AM next day). data:

A1 = received date & time (format "m/d/yyyy h:mm")
B1 = completed date & time (format "m/d/yyyy h:mm")

my formula is '=if(B1-A1>"24:00"+0,"Yes","No"). The problem with the formula is that it doesnt exclude weekends nor public holidays. I couldnt formulate a solution using networkdays function......

View 3 Replies View Related

Calculate Future Dates From Start Date With Varying Time Period/cycle

Sep 11, 2009

I need to determine a formula which will allow me to calculate a future date based upon a current date with varying time periods.

For example:

I have a bill which is paid on the 15th and last business day of each month. I would like to be able to see the next due date regardless of what day of the week it is.

I have a bill which is paid every other Tuesday. I would like to know the next due date without having to enter +14 for every due date in the future. In other words, it is preferable to be able to open the spreadsheet and automatically see the next due date, not use autofill to repeatedly add +14 to a previous date which would limit the # of future due dates that could be calculated.

I have a bill which is paid on the last business day of each month, not the last Friday of each month. I would need excel to return a value for the last day of the month which = Monday-Friday, regardless of what day of the week it may be as long as it isn't Saturday or Sunday(holiday exclusion would be nice but not required).

View 14 Replies View Related

Calculate Cycle Length Of Data Set

Feb 19, 2008

I have a data set that contains a repeating cycle. I want excel to find the first and second occurrence of the data crossing the zero axis and then report the time between the zero crossings. The data is not purely in ascending or descending order and often just changes from positive to negative or negative to positive without hitting the actual 0 point.

View 3 Replies View Related

How To Calculate Future Dates From Start Date On A Monthly Cycle

Sep 16, 2009

I'm trying to combine monthly calculations with "today" and with "workdays"

Example:

start date = 01/01/2009

today's date 09/16/2009

formula result = 10/01/2009 ; or if 10/01/2009 is a Sunday, result = 09/29/2009 (not 02/01/2009, 03/01/2009, etc)

=edate gives me a month but it doesn't skip weekends or calculate beyond today's date

View 14 Replies View Related

Net Workdays Cycle Time?

Dec 3, 2013

So I have a cycle time formula; Start Date to Completion Date, if the task is not complete the completion date field is blank. In this case the cycle time is listed as a negative 5 digit value. The networkdays formula takes into consideration weekends and holidays.How can this field be left blank rather than the negative value?

=NETWORKDAYS(I2,P2,Sheet3!$A$2:$A$10)

View 6 Replies View Related

Find Average Of Different Wave Lengths

Aug 14, 2013

I have attached an excel file. What I would like to find is the average of column D (number) with respect to column A (Genotype ) and also different wave length (Column C). i.e.:

Genotype 1 to its corresponding value in column D for wave length 450
Genotype 1 to its corresponding value in column D and for Wave length 470 to and so on.

Attached File : test2.xlsx‎

View 6 Replies View Related

Identify Max And Min Peaks Of Sine Wave

Dec 2, 2013

I have raw data from a cyclic test that needs to be refined to generate a simple trend.

The raw data has about 1000 points to each complete cycle and im only interested in the maximum and minium values of the peaks. This would be easy but I am typically dealing with 15 cycles a second and in some instances up to 5,000,000 cycles in one test.

The amount of data is too large to be completed in one file but if done in parts I can then use a formula to reduce the number of max and min peaks chosen i.e. 1 in 100.

View 8 Replies View Related

Excel 2007 :: Calculate Time By Time Periods Splitting Productivity?

Mar 8, 2014

production01.png

I am trying to figure a way to search for a cell that has a specific date and time range. There are several cell titles pending on the activity. I want to find a cell that has a time ** 7:30-15:30 , 15:31-17:30, 17:31-20:30. The end result is to calculate the activity between those time periods based on the data cells.

Example

If the date searched time field ** the activity ranges is 1635 I need to split the time and credit the activity time in the 730-1530 time and the rest on the 15:31-17:30 time

I have been able to do it on a single labor group based on time alone, but when I try to add the DATE to it my numbers go null. Eventually i will need to add 11 labor groups daily for weeks at a time .

Excel 2007

View 3 Replies View Related

Formula To Calculate Time Allotted Minus Time Used And Show Difference In Hour And Minutes?

Apr 27, 2014

Formula to calculate time allotted minus time used and show the difference in hour and minute.

View 1 Replies View Related

Play Wave Sound Then Stop Playing It

Jan 5, 2003

I'm using this simple code to play a wav file I loaded into a worksheet:

ActiveSheet.Shapes("Object 1").Select
Selection.Verb Verb = xlclose

I attached the macro to a button and it works. Now I need to stop the wave sound playing, by attaching another macro to a button. Is that possible? What syntax shall I use to stop playing the sound?

View 5 Replies View Related

Play Wave Sound Then Stop Playing It?

Sep 14, 2013

I'm using this simple code to play a wav file I loaded into a worksheet:

ActiveSheet.Shapes("Object 1").Select
Selection.Verb Verb = xlclose

I attached the macro to a button and it works. Now I need to stop the wave sound playing, by attaching another macro to a button. Is that possible? What syntax shall I use to stop playing the sound?

View 3 Replies View Related

Excel Sine Wave Graph/function Making

Feb 15, 2010

i have some numbers as data, i want to find the function that generate thiese numbers and also i want to view the chart of it, its kind of sine wave graph.

View 9 Replies View Related

Calculate Processing Time With Fixed Time Paramaters

Aug 28, 2009

I am wanting to calculate the the processing time for an order that takes place within normal business hours and workweek. A normal day is from 8:00 to 5:00 If a task is started at 2:00 PM Monday and finished at 10:00 AM Tuesday then the result should be 5 hours as I do not want to include any time outside of normal hours. I can figure out how to subtract dates and times but not how to bridge a day(s). My data is somewhat flexible as I have not started the project yet. I can use separate cells for the times and dates or have two cells that use both incorporate the date and time (8/27/09 2:00 PM) for start and end time or any other idea.

View 6 Replies View Related

Calculate Time With If And Formula When Time Passing 12am?

Jul 1, 2012

I have a problem here:

Eg.
A B C D E F G H I
1 8 pm 9 pm 10 pm 11 pm 12 am 1 am 2 am
2 8 pm 11 pm
3 8 pm 2 am

I typed a formula : =if(and(c$1>=$a2,d$1

View 4 Replies View Related

Using Userform To Calculate Time To Sheet From Start Time?

Jun 19, 2014

I have a userform that time stamps on my userform as soon as i open the form, is there a way that when I submit, that the amount of time that I was on the call to be put in my column on my worksheet as minutes?

View 2 Replies View Related

Calculate Work Time In Range Time (6:00 Am To 10:00 Pm)

May 17, 2014

I found this formula similar to other formula

NETWORKDAYS(D1,F1)-1)*"18:00"-"9:00")+IF(NETWORKDAYS(F1,F1),MEDIAN(G1,"9:00","18:00"),"18:00")-MEDIAN(NETWORKDAYS(D1,D1)*E1,"9:00","18:00")

By the way ....D1 = start Date
F1 = End Date
E1 = start Time
G1 = End Time

It's GREAT! But now I need include time from 6:00 a. m. to 10:00 p. m. (I already modified your formula:

(NETWORKDAYS(D1,F1)-1)*("22:00"-"6:00")+IF(NETWORKDAYS(F1,F1),MEDIAN(G1,"6:00","22:00"),"22:00")-MEDIAN(NETWORKDAYS(D1,D1)*E1,"6:00","22:00")) because are regular working hours in Colombia but:

1. All the days (Monday to Saturday) are working days
2. I just want to calculate the time in shifts, I don't specify the start date and end date. Example: 8:00 p.m. to 11:00 p.m. Result: 2 hours, because 1 hour is after 10:00 p.m.

This are two different options, so I need two separate formulas.

View 10 Replies View Related

To Calculate The Difference Between The Start Time And End Time

May 3, 2008

This may be a bit vague but here goes.

I have to calculate the difference between the start time and end time of a job. The only catch is, how can I avoid calculating "out of hours" time. So, if a job goes from 9am to 9am the next day, I want it to avoid calculating between the hours of 23:30 and 03:30.

Another example is if a job goes from 02:00 to 04:00, I want it to avoid the tim between 02:00 and 03:00.

If there is a difference in days, so the job goes overnight, how do I take that into consideration also.

View 9 Replies View Related

Calculate Time Difference In Decimal Time

Aug 16, 2008

I've got a time difference from 8:00AM - 12:30PM as 4.30 I'm trying to get the minutes, .30, converted into a 6 minute increment, .5. Is it possible to do this and if so how would it be done? Below is a chart of how the time is converted from 6 minutes increments into decimal form.

6 = 0.1 36 = 0.6
12 = 0.2 42 = 0.7
18 = 0.3 48 = 0.8
24 = 0.4 54 = 0.9
30 = 0.5 60 = 1.0

View 5 Replies View Related

Calculate Date Differences: Time In & Time Out

Aug 11, 2006

I'm trying to devise a formula to produce "days in inventory" based on the following data:

Date In
Date Out (which may be blank if cargo still here)
Todays Date
Days in Whse (which is the formula I can't figure out!)

It needs to work like this, date out - date in, unless date out is null. If date out is null, the result should be calculated based off of todays date - date in.

View 3 Replies View Related

Calculate Time Between Start Time And End Time?

Feb 7, 2014

the vendor has a 21 hr working window; start from 7am and goes until 4am; Mon to Fri.

Here is a scenario:
- i request for a product information from a vendor on 3-Feb-14 8:00am (Monday)
- he replies with all of the product info on 6-Feb-14 12:00pm (Thursday)

can you find the time in above scenario consideration the working window?

Here is another scenario:
- i request for a product information from a vendor on 6-Feb-14 8:00am (Thursday)
- he replies with all of the product info on 11-Feb-14 12:00pm (Tuesday)
- Sat & Sun are days off but keep in mind that my Friday shift ends on sat at 4am so the networdays formula wont work.

View 2 Replies View Related

Calculate The Time Between 2 Dates And Time

Feb 5, 2009

I need to calculate the time spent replying to my inquiries: I log the time I receive my inquiry as: 06/02/2009 09:23:00 in column A. I log the time I send my reply as: 07/02/2009 07:23 in column B. In column C, I need to put the Formula that will return the following result: 0 days 22.0 hours.

View 5 Replies View Related

How To Calculate Time

Aug 12, 2009

WHen I was a beginner at Excel, I came up with the following formula to calculate the time difference between two "time" values. Since I was too lazy to add a ":" between my hour and minute, I had decided to simply enter the start (column B) and end time (column C) as a military time (e.g., 0100, 1230, 1500, 1930, 2300, 2359). The following formula would be in Column D.

=IF(C7

View 9 Replies View Related

How To Calculate Average Time

Aug 6, 2014

how to find the average times of two different sets of groups. There are the baseline times and intervention times. Both groups have three subtopics: Time Fell Asleep, Woke Up, and Duration (how many hours I slept). I am not sure how to find the average of each subtopic. Here are the times....

Baseline times:
Fell AsleepWoke UpDuration
2:30 AM10:00 AM7:30 hrs
4:30 AM12:30 PM8:00 hrs

[Code]....

View 3 Replies View Related

Display And Calculate Time

Jun 23, 2009

I have a problem with a time card i am producing. I want to count hours and minutes worked and carry forward any surplus or deficit into the next week. I can do it if the hours do not total more than 24. I have attached the file and it is formatted in 1904 format.

View 2 Replies View Related

Calculate Time Outside Of Specified Ranges

Dec 12, 2009

I am staring at this excel spreadsheet blankly ... I am at a loss as to how to accomplish the detailed analasys but simple math this spreadsheet reequires.

The data consists of three columns pasted from a report that is exported as a .csv:

B
Code
C
Start Time
D
End Time

The following analyses must be made on each row:

1. determine if the start time falls within the scheduled shift

View 9 Replies View Related

Calculate Time From Userform?

Jul 14, 2010

I need to compute the total time in a userform.

I have a userform where:

1. User enters a start and end time Start1, End1 (23:00, 01:00)
2. The time difference is calculated and displayed in Total1 (2:00)
3. User enters Start2, End2 (22:00, 22:50)
4. Time difference calculated - display in Total2 (00:50)
5. Grand total of Total1, Total2 is displayed in GrandTotal (2:50)

The user will input the times as 0000 but I need to convert the entry into a time format. (User enters 1235 - I need it to covert to 12:35)

View 5 Replies View Related

Calculate Time Over Last 2 Weeks?

May 15, 2012

I have a calendar. All months across the top, formatted as date mmm with content 1/2 2/1 3/1 4/1, etc. so the cells display Jan Feb Mar Apr, etc. All days down the side formatted as number displaying 1, 2, 3, 4, etc. All the days of the year are formatted as time h:mm.

I want to create a cell that shows me the total time for the last 14 days.

View 1 Replies View Related

Trying To Calculate (Time To Top Speed)

Feb 17, 2013

I have 3 numbers:

1) Current Speed
2) Current Acceleration
3) Acceleration Growth

Assuming:
Current Speed=0
Current Acceleration = 0.2 (each 'turn' the current speed will increase by this much)
Acceleration Growth = 0.2 (each 'turn', the current acceleration will grow by this much)

This gives a current speed over a series of 'turns' as
0.0 + 0.2 = 0.2
0.2 + 0.4 = 0.6
0.6 + 0.8 = 1.4
1.4 + 1.0 = 2.4
2.4 + 1.2 = 3.6
3.6 + 1.4 = 5.0
5.0 + 1.6 = 6.6
6.6 + 1.8 = 8.4
8.4 + 2.0 = 10.4
etc.

What I'd like to do is have a formula (or some way other than calculating each step) to tell me how many turns it would take for the Current Speed to =>X (example 100)

Basically, Turns to X speed = something clever * acceleration growth * something else very clever.

View 9 Replies View Related

Calculate Due Date & Time

Sep 3, 2009

I want to be able to calculate a due date two days from an entered date/time. If I input 9/3/2009 3:00 PM into cell F6 I would like cell G6 to display 9/5/2009 3:00 PM. The formula that I am currently using includes a holiday list so if the due date lands on a day within that list it gets pushed out.

My formula is =if(F6="","",Workday(F6,2,Z1:Z144)).

Basically when F6 gets populated G6 is supposed to populate with a due date of two days later (same time of the day). Currently if my input date/time is 9/3/2009 3:00 PM the formula is displaying a due date of 9/5/2009 12:00 AM.

View 9 Replies View Related