I am working on this for two days , but I got stuck on the last step. I have a roster for about 35 employees. Calculating the daily hrs was not a problem. But I am doing the roster for one week. And I want employee wise total of hrs worked. I am quite confused as the "sum" formula works for some totals and for others it does not, although all the cells are in the right format. I tried to change the "result" cell to "number" and multiply by 24 to get the hr total as a number, but it does not work.
for example "SUMIF(E1:E57,"rafik",H1:H57)" ( this is the formula for calculating hrs for "rafik" on monday. the result cell is in "hh:mm" format and gives me the right total.
Likewise upto sunday the totals are right. What I want to do is calculate the total number of hrs from mon to sun. This seems to be impossible. the formula =SUM(H60:AL60) in a dd:mm format does not work, even =SUM(H60:AL60)*24 in a "number format" does not work.
I have tried "excel help" , tried to change the format but nothing works. The result should be 52 hrs and I cant get it no matter what I do.
View 9 Replies
ADVERTISEMENT
Aug 11, 2004
I am currently trying to create a rota / rosta for work which will show people what hours they are required to work, in a format similar to below:
NAME | SAT | SUN | MON | TUE |etc >
Person A| 8:00 - 17:00 | 13:00 - 22:00 | OFF | 8:00 - 13:00|
Person B| OFF | 17:00 - 22:00 | 8:00 - 17:00| OFF |
This is simple enough to create but I also need Excel to calculate how many hours each person is working in a week and the total number of hours used per day and per week. I found out that I can do this using a formula to work out hours and minutes between two times. However what I would also like Excel to do is deduct the unpaid breaks which the person is entitled to, however this depends on the times that they work, i.e. in the example above Person A would be entitled to a 1 hour unpaid lunch on Saturday, a half hour unpaid tea on Sunday and no unpaid break on Tuesday. Therefore 1 hour would be deducted off the Saturday total hours, 30 minutes would be deducted from the Sunday total hours and nothing taken off the Tuesday.
View 7 Replies
View Related
Mar 26, 2013
When I enter L into B3 I want B3 to show a message.
i.e. B3 is blank, I enter L into B3, it the changes L to 0645 - 1515.
And it needs to be in time format so at the end of the roster i can add how many hours in total.
View 3 Replies
View Related
Aug 6, 2009
I need to calculate the total cost of outbound calls based on the total duration of outbound calls multiplied by cost per minute. For example, in a given month, the total duration of outbound calls is 261:16:34 being 216 hours, 16 minutes and 34 seconds. I have this figure in cell A1 with the format [h]:mm:ss. I then convert this to minutes in cell B1 by saying B1=A1, but having the format [m], which gives me 15676. In cell C1, I have the cost per minte value of £0.026. But when I apply the formula D1=B1*C1, I get £0.283, when 15676*£0.026 should in fact be £407.58.
View 2 Replies
View Related
Oct 7, 2013
I have created a spreadsheet as follows:
Date revenue total tickets sold total tickets sold per day
10-1 166,453 15374
10-2 166,915 15414
How do I formulate so that the numbers automatically update per day
View 2 Replies
View Related
Jul 15, 2009
I have a row of totals in a spreadsheet and I want to calculate a forecasted total based on the previous month's totals.
For example I have two months and I want to know how to calculate the forecasted Jun 09 total: ...
View 10 Replies
View Related
Jul 3, 2014
I want to calculate a running total (so add a new value to its original value). For example, cell A1 is the one I will be changing daily, and cell B2 is the one that I want a running total in. So if I start with A1 being 5, B2 should be 5. If the next day I type in 3 into A1, B2 should now read 8. However I want to do this for a column length, not just cells A1 & B1. So column B would be the running total of the column A values. If A2 is 3 one day and the next it is 6, B2 should on the second day read 9. And on and on down the columns.
I tried doing this without VBA using iterations, but that didn't work. Every time I did that it would add values going down, which was weird cuz none of the cells referenced the cell above it. I didn't know if they would work since I have multiple sheets in this file. (I'm only calculating the running total in one sheet, the others aren't doing anything special.) I need all the sheets in my file and I didn't know if VBA modules are sheet specific/ if you need to be sheet specific when coding.
Another question I have (since I know nothing about VBA) is how do modules work? Do you need to turn them on in the Excel spreadsheet itself? Or when you save it does it just automatically apply itself to the file its attached to?
On another note, how to do this WITHOUT VBA, that would be like 100x more fantastic.
View 7 Replies
View Related
Jan 19, 2007
in my worksheet i have different kind of items with its cost. in my case which is not in order, that is, the order of items can be AABAACCBA. I want to calculate Cumulated Total on each row. but i am not sure how to achieve this by conditional formula? the values in my sheet looks like the following,
Date ITEM TYPE AMOUNT Cumulated Total
10-Jan-07 BookA1010 -value(Book)
11-Jan-07PenA515 -value(Book+Pen)
12-Jan-07TableB1515 -value(Table)
13-Jan-07PencilA2035 -value(Book+Pen+Pencil)
14-Jan-07ChairB2540 -value(Table+Chair)
15-Jan-07SofaB3575 :
16-Jan-07RoseC2020 :
17-Jan-07Calc...A3065 :
18-Jan-07JasminC1030 -value(Rose+Jasmin)
find the attachment for reference. How to achieve this using conditional statement or lookups or someother? and i try to avoid macro.
View 4 Replies
View Related
Apr 22, 2009
This may not be the best way to do this, but I don't know Macros or Pivot Tables.
I am looking for a way with formulas to do the following:
Within a workbook the 1st sheet is the data entry.
In another sheet that will total data from the data sheet is where I want to be able to total columns of data, depending on what is entered in one specific column:
Example:
Data Sheet, E2:E2999 is a unit number selcted by pull down tab entry.
G2:G2999 in the same sheet is where the data is.
Q: What formula would allow to total the data on the Total Sheet depending on what unit number is selected in column E on the Data Sheet and the data amount in column D from Data Sheet?
View 9 Replies
View Related
Dec 21, 2008
I'm sure this can be done but I don't think I have the formula correct. What I am trying to do is add each day's total while displaying a positive number if the total exceeds 6000.
View 5 Replies
View Related
Jan 23, 2014
I'm trying to calculate total occurrences of a given month. I have included the spreadsheet for reference with totals.
I only want to calculate when the Policy column has a "N". If it has a "Y" I do not need to do anything
If the Policy has a "N" I want the formula to look at the V and P columns and give me a total in the Total Occurrence column. I want it to look at the entire month for a grand total.
If the V or P column has a 4 or less it should equal 0.5, if it has a value is between 4 and 10 it would equal 1. So in the Total Occurrence column should calculate the all of the 0.5 and 1's based on each set of columns and give a total. In the example that I have given in the spreadsheet the total in the Total Occurrence column would be 2 because Jan. 1 has a N and a 8 which equals 1 and Jan. 3 has a N and a 4 which equals 0.5 and Jan. 5 has a N and a 4 which equals 0.5 for a total of 2 occurrences.
View 10 Replies
View Related
May 2, 2008
I need to calculate time taken to fix a piece of equipment.
A1 B1
BREAK TIME FIX TIME
4/22/08 23:00 4/23/08 04:00
Should be 5 hours, but i can't find the formula to make it work.
View 14 Replies
View Related
Dec 13, 2013
number for item detail level from category standpoint. For example, in the category sheet has total number per category and per month and in the item detail sheet has a list of item number with category. I want a formula to recognize which item belongs to which category then use the total number of category by month to multiply with % of total in column D from Item Detail Spreadsheet.
View 2 Replies
View Related
Mar 14, 2009
I'd like excel to calculate 3 totals for me based on the colour and value on a worksheet.
Basically, I work for various people and they pay at different rates per hour.
I currently have a spreadsheet with their names, times, and rates (see attached for example), but I calculate the amounts paid and due manually.
If possible I would now like excel to do it.
To explain further, 'J' gives me $10 per hour, and 'V' gives me $5 per hour.
Cells shown in red show work done but not paid for.
Cells shown in green show work done and paid for.
I'd like excel to automatically create totals as shown on the spreadsheet, namely:
Total due: xxxx
Total paid: xxxx
Total outstanding: xxxx
At any time during the month I can be asked to take on more work - I would then enter the code into the spreadsheet for the hours requested...and I'd like the totals to be update automatically.
View 7 Replies
View Related
Mar 26, 2014
I have a workbook with each month as a tab Jan 2014- dec 2014. I have a totals page that's has total billings( the sum is adding all the totals of each month). The totals for each month are in different cells based on the number of individual invoices I enter for each month. I have entered jan- march invoices. I would like to put in a formula on my totals sheet that gives me a ytd avg without changing it. ie: d4/3 then next month april d4/4.
View 1 Replies
View Related
May 6, 2009
Using Excel 2002. Here's my problem.
Column A contains the month (as text)
Column C contains an employee name.
Column O contains a reason for absence.
Column K is the number of hours of absence.
The employee's name may appear several times in the worksheet. What I want to do is count the number of hours per type of absence.
E.g. If A=MAY and C=BOB and O=SICK then total hours from all instance of K = X.
This will be used on a seperate worksheet where the name C will be referenced from a validation list.
View 9 Replies
View Related
Feb 12, 2014
I am trying to come up with a formula that calculates total time someone has worked in a day. The scenario is an individual will work at a home and start working with an individual. Their start/end times look like this in a pivot:
Min Start Max Start Min End Max End
Location A+Counselor A 8:56 AM4:01 PM 1:11 PM 7:00 PM
Location A+Counselor B 12:00 AM 8:00 PM 6:00 AM 11:59 PM
Location B:Counselor C 7:00 AM 12:00 PM 2:00 PM 4:00 PM
Location C+Counselor D 8:00 AM 8:00 AM 4:00 PM 4:00 PM
Some people work split shifts while others work a straight shift. The formula I created was this:
=IF(OR(B9=C9,E9=D9,D9=C9),E9-B9,IF(D9>C9,((E9-D9)+(C9-B9)),IF(C9>D9,((D9-B9)+E9-C9),"New Formula Needed")))*24
(I use a pivot table to show max min for start and end times)
This works great except for the individuals that have multiple punches during the same time frame. The one scenario I am having trouble solving for is when someone punches in more than once during their shift displaying. This occurs when a counselor starts a shift working with one person but then adds another person mid shift. An example of this could be:
Location A+Counselor E Min Start Max Start Min End Max End
Consumer 1 1:00 PM 1:00 PM 8:30 PM 8:30 PM Total Time: 7.5
Consumer 2 12:00 PM 12:00 PM 2:35 PM 2:35 Pm Total Time: 2.6
Pivot says that they worked a total of 10.1 because it is grabbing the max and mins and calculating. The actual total time worked is 8.5 hours in reality.
The raw data comes in like so:
Location Counselor Consumer Start Time End Time
A A A 1:00 PM 8:30 PM
A A B 12:00 PM 2:35 PM
A A C 12:00 PM 5:00 PM
Is this solvable with a formula?
View 1 Replies
View Related
Apr 14, 2009
I have set up a spreadsheet to calculate time as followed:
A1 - Start Time
B1 - Finish Time
A2 - Hours Worked:
=IF(B1<A1,B1+1,B1)-A1
C1 - Start Time
B1 - Finish Time
C2 - Hours Worked:
=IF(D1<C1,D1+1,D1)-C1
and so on.........
View 10 Replies
View Related
Mar 23, 2013
I need creating a formula that will tell me the total number of employee hours worked during a certain hour (6:00 AM) for a particular department. Some employees clock in at 6:00 AM, some clock in at 6:30. Here is the current formula I'm using which only tells me the amount of employees in the department not how many hours worked . I have three employees that clock in at 6:00AM and one at 6:30AM, the total I'm looking for is 3.5 but my formula gives me the result of 4.
C5:C1446 is a list of departments
T1503 is the 6:00 AM
D5:D1446 are the Clock In times
K5:K1446 are the Clock Out Times
=SUMPRODUCT(--($C$5:$C$1446="Shipping"),($T$1503>=$D$5:$D$1446)*($T$1503
View 6 Replies
View Related
Jun 7, 2014
I have sales numbers which is in the form of a running total dollar amount and I would like to keep track of the average increase in dollars.
So basiclly if the Jan total is $100 in column a, the Feb total is $150 in column b, and the March total is $200 in column c. I would like a formula that will tell me that the average increase in dollars is $50.
View 2 Replies
View Related
Apr 16, 2007
In column A I have a list of 5 Auditors labelled Q1 - Q5, 5 Coolum’s across in column F I enter in their scores as a % e.g. 80%. ...So Q1 - 50%, Q2 - 60%. In column A37-A41 I have Q1-Q5 listed, in Column B37-B41 I need to calculate the average deviation per Auditor eg. If Q1 has 2 entries of 50% and 75% return average value in cell A37 which should be 62.50%. I am trying to calculate the average for each Auditor. find attached example.
View 2 Replies
View Related
Jan 9, 2014
Excel ( 2010 ). I am creating a Sales Leads spreadsheet. Within the spreadsheet I have a the following relevant fields.
proposed sales value field ( F2 ), Estimated Close - which will be Q1,Q2,Q3 or Q4 ( G2 ), % Probability ( H2 ) & Q1 ( I2 ), Q2 ( J2 ), Q3 ( K2 ) & Q4 ( L2 ).
F2 = 150
G2 = Q2
H2 = 10%
I want to calculate the actual value of sales based on %prob and put the total into the correct field ( I,J,K or L ) based on what field G2 says. So in this case 15 into field J2. I have attached an example.
View 4 Replies
View Related
Jun 9, 2014
I have a column with Cells that will sat True or False, the amount of rows will be different every time, I need to work out what the total percentage of True cells compared to the total number of cells. How would this be achieved.
View 9 Replies
View Related
Apr 21, 2014
I have an excel workbook which requires us to enter the log details of some sites and then a report is generated using these logs (report attached) . [URL] .......
I want that excel should automatically identify the site and calculate its outage with the following formula:
Outage %age= Total Outage(min)/100.80
and add it in the respective column while identifying the outage.
e.g. if outage is of power then the calculated %age outage should be pasted in the power outage column in front of the respected site.
e.g. in the sheet attached above the first row in the first sheet states that SKU2326 was down for 50 mins
Now %age outage will be
Outage %age= 50/100.80
Outage %age=0.496
Now as the outage is related to power so this outage should go into power column in sheet number 3 labelled as "Network Total Up time Week#17"
Now the next time SKU2326 becomes down it should be added with this 50 mins and the outage calculated as presented above.
View 1 Replies
View Related
Mar 30, 2007
I have been asked to make a formula that sums up the hours in a week and then tells me whether I am below or over the budgeted hours for that week!
I cant get it to work since I cant figure out how to have the same formula in all the cell that sums up early, mid and late shifts, ie 06-14, 14-22, 22-06.
The graveyard shift is a problem there since I get negative hours.
Further more, I need to have the formula ignore cells to be added up if it has letters in it, we write an R for Rostered day off.
View 9 Replies
View Related
Aug 6, 2008
Been trying to come up with a formula that I can use in cells to cost a roster.
What I want to be able to do is just input start times into cells and the hours worked is automatically costed out in another cell. The trouble I have been having is that different start times attract a shift allowance eg. before 05:00 you get a 20% loading for the whole shift, between 07:00 and 19:00 is 10% and any finishing time after 19:00 is 15%, don't know how to write the formula to do this.
View 10 Replies
View Related
Mar 13, 2007
I'm trying to set up a web query that gets the Player Roster from Indians.com and one column is giving me trouble.
On the web site, this column is the player's height, listed as, for example, 6-2.
When the web query import is complete, this column displays a date instead of the height.... so 6-2 comes in as 2-June.
How do I massage this column to display the height and not a date?
View 9 Replies
View Related
May 28, 2007
Need excel formula (not a marco) to rotate the names in the roster.
View 2 Replies
View Related
Aug 19, 2007
where I might find some?
View 3 Replies
View Related
Nov 19, 2008
Any non-commercial roster template that would suit 7 day/24 hour/4 person shifts?
Currently we use a totally manual spreadsheet which looks like a Rubik's Cube and does not offer any form of automation in order to speed up entry adn ensure no doubling-up or missing shifts.
View 9 Replies
View Related