It is data for a time study to compute labor hours. I have managed to group everything together per "work order" and "Employee ID". I am trying to sum up the labor hours by work order. I know it sounds simple but I do have another question. Once the total hours are set. Are they still available in the same format when put in a Pivot Table?

View 2 Replies


ADVERTISEMENT

Landscaping Company / Matching Units / Volume And Labor Hours To Hourly Labor Rate

Jun 26, 2014

For a landscaping company, who is looking to service gardens more effectively/efficiently, they are mirroring the below variables to the amount the client is willing to pay per hour. I also have a sample file.

I have, on Sheet1, 8 columns I'm working with:

R3:R132 is the currently hourly rate

L3:L132, M3:M132, N3:N132 are current units, volume, and labor hours respectively by location.

AD3:AD132, AE3:AE132, AF3:AF132 are new units, volume, and labor hours respectively by location.

AI3:AI132 is the suggested hourly rate by location. Note this is already calculated and filled in. I need to calculate new units, volume, and labor hours based on the suggested hourly rate.

On Sheet2, I have 4 columns I'm working with:

A2:A161, B2:B161, C2:C161, B2:B161 are hourly rates, units, volume, and labor hours respectively.

They are laid out in combination with one another to show possible combinations of these variables that make sense for the landscaping company.

My goal is to figure out what combination the company wants to go with for a given hourly rate on Sheet1 given the following logic to follow:

1) Attempt to reduce labor hours to get to suggested hourly rate - This is to calculate new labor hours on Sheet1 in cells AF3:AF132.

View 1 Replies View Related

Add The Hours Someone Is Scheduled To Work

Sep 10, 2007

I am looking for a funtion that will help me add the hours someone is scheduled to work. The problem I am having is the format. Here's the format: The days of the week are Mon - Sun (D3-J3). L3 is a total of the hours they are scheduled to work for the week. Cell D3 is 8-2. Cell E3 is 9-3, etc. for the rest of the week. What I am looking to see if possible is in L3 take the row, Take D3 at 6 hours, E3 at 6 hours, etc for the rest of the row, and add them together for the total hours in L3. I have attached a small example file of what I'm trying to do. The format I am looking to use for the hours is as described above.

View 11 Replies View Related

Data Consolidation And Sorting

May 15, 2014

I have A spreadsheet.

The spreadsheet contains 8 worksheets, of which I am only concerned with 7 as the 8th merely presents a graph.

The first 6 worksheets all contain raw data exported from BMC Remedy indicating the names of users who logged incidents to have their passwords reset or their AD Accounts unlocked over a 6 month period, hence 6 worksheets (per month basis).

The 7th worksheet contains raw data from another application known as FIM (A MS based interface which allows users to reset their own passwords) indicating all users who are registered to utilize this functionality.

The goal of my exercise is to consolidate the data and sort it to such an extent where I can ascertain which users phoned the service desk to log an incident for a password reset, even though they are registered to do it themselves via FIM ... I have been going through the list manually and it took me 10 solid hours to go through 265 ... ... ... ... I have 3'900 to go through!

View 1 Replies View Related

Consolidation Of Data From Different Worksheets

Sep 8, 2008

consolidating all data from different worksheets. I have use the consolidation function in excel but the result is not what to appear.

Example:
Sheet 1
nameAddTeljclag123jpasd321jmds234

Sheet 2
nameAddTeljolag135jfasd357eedds234werpoi567

Result using consolidate
AddTelBook1123jc123Book1321jp321Book1234jm234Book1135jo135Book1357jf357Book1234eed234Book1poi567wer0567

Expected result
nameAddTeleedds234jclag123jfasd357jmds234jolag135jpasd321werpoi567

View 9 Replies View Related

Calculate Each Employee Work Hours

Apr 11, 2013

Just like if I put the employee's number and work time for each day,

The excel will accumulate the hours automatically somewhere in the sheet. (I don't want the total hour cover each day's work time)

Is there anyway I can do it?

View 5 Replies View Related

Subtracting Hours In A Work Schedule

Aug 29, 2009

I am working on a monthly employee work schedule that has 2 stores. All employees work at both stores and the boss wants 2 separate schedules.

I have attached what I have started, which at the moment I am stuck.

I would like to have the Row 5 total hours to always reflect (subtract) a 30 minute lunch. I know it would be easier to have another column, but the boss wants it this way,

I also need the total hours in column H to reflect the total of each day (with the subtracted lunch break). In this column I am having the figures turn red if over 40 hours and green if it under 40 hours.

With having 2 stores with the employees working at both, I need to somehow have the hours of the employees add up from one store to the other (a running total, if you will).

Lastly, if I have an employee not scheduled for a day or need to put other data such as, VAC, HOL or blank cell etc in a cell, how can I get this to work and not have the formula go nuts when it is not in a time format.

View 14 Replies View Related

Removing Non Work Hours From Calculation

Mar 9, 2006

I am trying to work out the minutes elapsed for a call monitoring
system. The hours monitored are between 05:30 and 19:00 - so if a call
gets logged outside of these hours then the minutes calculated will be
calculated from 05:30 the same day if logged on or after midnight or
05:30 the next day if logged before midnight (ie the next 05:30).

View 22 Replies View Related

How Can I Get Excel To Work Out My Hours And Overtime

Jan 31, 2009

I charge £45 per hour with a couple of conditions - minimum 8hr day and then 1.5T after 12hrs.

Is it possible to have a table where I put in my hours and then Excel tells me how much I should charge?

View 9 Replies View Related

Month Wise Work Order Totals

Jul 27, 2009

See the attached file. I need month wise work order totals. for more details see the pivot table also

View 4 Replies View Related

Auto Generating Work Order Number

Jul 2, 2008

I am using Excel to produce work orders and I need each one to have its own unique number. Much like an invoice or contract number, each time I open the file I would like Excel to generate a new number for that spreadsheet with a value of 1 more than the previous spreadsheet.

View 14 Replies View Related

Calculating Time To Track Work Hours

Jul 24, 2009

I can't figure out how to do a proper formula for calculating time. For instance I have one column that says "Time In", the next is "Time Out" and the other is "Lunch Time". My calculation needs to be this:

Find the total hours between the Time In and Time Out and then Minus the lunch time to get total hours worked for the day. The only way I can get this to work is using 24 Hour time format. Is there another way?

View 3 Replies View Related

Calculate Employees Work Hours For Overtime?

Apr 15, 2014

I have to calculate employees work hours for overtime.

in the timesheets:

A B C D E
1 ID Date Code Hours PayMethod
2 A123 4/14/14 TRN 20:00 Regular
3 A123 4/14/14 TTT 15:00 Regular
4 A123 4/14/14 TRN 13:00 <----- total for cell D2,D3, and D4 is more than 40

A B C D E
1 ID Date Code Hours PayMethod
2 A123 4/14/14 TRN 20:00 Regular
3 A123 4/14/14 TTT 15:00 Regular
4 A123 4/14/14 TRN 5:00 Regular <----- to make 40
5 A123 4/14/14 TRT 8:00 Overtime <----- 13-5=8, so i have to write down 8 here for overtime

How can I do this?

I want to make a command button for macro to perform this.

View 2 Replies View Related

TimeSheets :: Work Out Formula For Working Hours

Dec 27, 2009

Want to work out formula for working hours If Mr Smith is booked to work I must pay him a min of 8 hours pay at rate A then upto 10 hours still on rate A but after that he gets rate B I need to enter his data on a daily spreadsheet

View 9 Replies View Related

Work Rota/Roster Calculating Hours

Aug 11, 2004

I am currently trying to create a rota / rosta for work which will show people what hours they are required to work, in a format similar to below:

NAME | SAT | SUN | MON | TUE |etc >
Person A| 8:00 - 17:00 | 13:00 - 22:00 | OFF | 8:00 - 13:00|
Person B| OFF | 17:00 - 22:00 | 8:00 - 17:00| OFF |

This is simple enough to create but I also need Excel to calculate how many hours each person is working in a week and the total number of hours used per day and per week. I found out that I can do this using a formula to work out hours and minutes between two times. However what I would also like Excel to do is deduct the unpaid breaks which the person is entitled to, however this depends on the times that they work, i.e. in the example above Person A would be entitled to a 1 hour unpaid lunch on Saturday, a half hour unpaid tea on Sunday and no unpaid break on Tuesday. Therefore 1 hour would be deducted off the Saturday total hours, 30 minutes would be deducted from the Sunday total hours and nothing taken off the Tuesday.

View 7 Replies View Related

Work Days And Hours Between Two Dates & Times

Apr 7, 2008

I am creating a 'HelpDesk Issue Logger' and I am trying to calculate the Network Days and Network Hours between two dates with times. I want to know how many business days and hours are between the two days to give me a TURE 'Response Time.'

I have been to several sites and forums looking for the answer, but I have not been able to find a solutions that works for me. Please find attached a 'stripped' down version of my project.

Variables:
- 'Date Received' (H11)
- 'Date Actioned.' (I11)
-'Response Time' (K11)

Constants:
Work Days = Monday to Friday
Work Hrs = 8:30 AM to 5:30 PM (no lunch break)
Public Holidays = (AC13:AC30)

Formats:
Date Received: dd/mm/yyyy hh:mm AM/PM
Date Actioned: dd/mm/yyyy hh:mm AM/PM
Response Time: d - hh:mm

If there is someone out there wiling to put me out of my missery with this one, you will have a friend for life.

View 9 Replies View Related

Consolidation Of Data From Multiple Worksheets

Dec 20, 2013

Consolidation of data from multiple worksheets of a workbook in a different workbook.

The, to be copied ranges are static at column B, E & AB. However, the data is required to be copied below each other for each sheet. Also the name of sheet is required to be assigned to every copied data in consolidated file...

Suppose i have 5 sheets with data... then in the consolidated sheet i need name of "sheet1" to be assigned to all the copied records and so on for all the sheets...

Sub trial()
Application.ScreenUpdating = False
Dim Wb As Workbook
Dim path As String

[Code] ........

View 1 Replies View Related

Find Unique And Calculate Total Of Work Order?

Aug 2, 2014

I have been playing around with some data and can't seem to get it the way I want it. I have played around with Pivot tables and grouping but I can't seem to figure out how to accomplish what I need in Excel. To better explain I have attached some test data of what I am trying to accomplish.

View 14 Replies View Related

How To Find Out The Number Of Hours Of Minutes Work Per Shift

Feb 3, 2014

I would like to find out a way to work out the number of minutes worked during particular shifts for weekdays. Basically I have two columns, one for start time, and one for end time. They are formatted like dd/mm/yyyy hh:mm. So they have the date in there as well.

I would like a formula that would look at a range say A1-A11 and work out what shift it is and then output number of hours worked per shift. Day shift would start at 8am and finish 5pm, Twilight shift would start at 5pm and finish at 9:30pm, night shift would start at 9:30pm and finish at 8am the next day. So I would need it to check for example the start and end times (and dates) and then output 3 rows that show the total minutes worked.

There will be multiple days so it would need to say for example Monday Day, Twi, Night, Tuesday Day, Twi, Nights etc. Up to Friday Day shift because we don't work Friday Twilight or Nights, and we don't work Weekends.

Basically there is a list of jobs completed with Start Time and End Time for each and I also have a column that works out the number of minutes worked on that job. So the formula would need to look at many rows.

View 7 Replies View Related

Formula That Allows Me To Type In Their Hour Work If It's Greater Than 40 Hours

Dec 28, 2006

I am building a spreadsheet to manage 15 folks wages to be able to know how much money has been spent.
We routinely work 40 hour weeks and have a sheet that automatically multiplies hour work by person (Say A1) times their hourly rate (say A2)

My question is how could I right it a formula that allows me to type in their hour work (A1) if it's greater than 40 hours?

Say A1 is 40, A2 =$20.00, A3 =(A1*A2) $800.00

If the A1 is 43 what would I put into A3 that would automatically multiply the additional hours over 40 times 1.5 A2

View 9 Replies View Related

Formula For Date And Time Difference Using 8am-5pm Work Hours

Oct 22, 2008

I need to enter a formula that calculates the time a report is received from the time it was recorded in our database. therefore, it needs to exclude non working hours. here are the fields:

A1 2008/10/10 16:30
B1 2008/10/11 09:30
C1 8:00
D1 17:00

A1 = report received
B1 = reported recorded in db
C1 = work day start time
D1 work day end time

Where the answer should = 2 hours.

I am not an experienced excel user and so far the only formula I have now is: =TEXT(B1-A1, "d:hh:mm")

And how do I account for weekends?

View 9 Replies View Related

Automatic Consolidation Of Data From Multiple Sheets?

Jul 23, 2014

I have data that varies in string length across sheets but I would like to consolidate it based on name. Ideally, a pivot table would make sense to me but I have never used one across sheets (if it's even possible). I've attached a sample sheet I'm working with. This is very simplified, but assume that the shaded, gray fields are locked. Essentially, this is simulating that is getting pulled from software.

View 2 Replies View Related

Create A Spreadsheet That Will Automatically Increase The Work Order Number By 1?

Jun 20, 2014

I am trying to create a spreadsheet that will automatically increase the work order number by 1. The cell will always be in the same place. The idea is that when the file is opened it populates the number. After being closed and reopened the number will be 1 higher than the previous.

The page will reused by various people to create and print work requests for my mechanics, I want it to assign the W/O automatically.

View 11 Replies View Related

Calculate Difference Between Dates In Work Hours With Lunch Period

Mar 8, 2013

I need also to calculate difference between dates(dd-mm-aaaa hh:mm) in workhours ( hh:mm):

The work period is 9-18 with lunch interval 13-14 The startdate and end date could be out of the work hours and i can't include the extra hours. I can have several days (workdays) at the difference, but i should maintain the format hh:mm.

Ex1:
Startdate 05-03-2013 18:34 ( date to calculation should be 05-03-2013 18:00)
end date 06-03-2013 10:30
Time Difference 1:30 ( from 9 to 10:30 of 06-03-2013 )
will be equal to:
Startdate 06-03-2013 8:34 ( date to calculation sould be 06-03-2013 9:00 )
end date 06-03-2013 10:30
Time Difference 1:30 ( from 9 to 10:30 of 06-03-2013 )

Ex2:
Startdate 06-03-2013 12:01
End date 06-03-2013 14:28
Time Difference 01:29

View 3 Replies View Related

How To Calculate Work Hours From Only A Start And Finish Date And Time

Feb 28, 2013

I can calculate total hours when a user enters a start date/time and a finish date/time. The kick is I only want to include hours from 2:00 PM to 12:00 AM (10 hour period). So assuming all the start and end times will be in this range, how can i calculate work hours over multiple days? For example: Start date/time = 2/26/13 2:30 PM and end date/time = 2/28/13 10:30 PM. I want my calculated hours to show 28 hours.

View 1 Replies View Related

Custom Format Does Not Work - How To Change Column B2 To Hours And Minutes

Mar 3, 2013

The attached file contains data. In Worksheet 1 (and also 2 and 3) column B2 shows day, month, year, hours, minutes and seconds. I was hoping to convert this to just Hours and Minutes, but all the usual methods using Custom Format does not work. This leads me to think that its in TEXT format. How can I change Column B2 to Hours and Minutes?

View 14 Replies View Related

Consolidation Of Workbooks To Single Workbook When Data Is More Than 66k Lines

Aug 24, 2012

I have around 21 excel files in a particular folder all the files column headings are same and but number of line differ from 0 to 50K. Overall all 21 files will have more then 2 Lakhs lines.

i require a code which consolidate the all 21 files in to single workbook. if first sheet in full then data should copy to next sheet, so on. I also require file name in the first column of destination file when files are being copied.

View 1 Replies View Related

How To Perform Consolidation Of Data And Sort Through Dropdown Menus

Nov 5, 2013

On the spreadsheet there is 31 days (a separate worksheet per day).

at the bottom of each sheet there is the case notes for that day. I would like all that information collating on the last sheet of the workbook (named Cases).

I would like to be able to sort through that data with the use of some drop down menus.

All i need to sort is the Brand and if the case is open/closed.

what to do so I can try myself or using the attached spreadsheet be able to sort this problem out. If you choose to use the spreadsheet to meet the requirements

View 14 Replies View Related

Creating Simple Monthly Work Schedule For 6 Employees But Need To Tally Hours

Aug 19, 2013

Maybe it is the layout but I was trying to keep it simple and just put hours into a cell for each employee.

I have 2 employees per day, one in the morning and one in the evening. How to get excel to add the hours for each employee at the bottom per month. Simple right?

Here is an example of what I thought would be so easy (first week in excel spreadsheet format)

sun mon tue wed thu fri sat
emp1 5 emp3 6 emp5 5 emp1 4 emp3 5 emp5 5 emp1 6
emp2 5 emp4 5 emp6 5 emp2 5 emp4 5 emp6 6 emp2 6

Is there a way to associate cells to look at values for each employee and add all the cells for the month?

View 5 Replies View Related

Calculating Manhours/labor Cost In 2003

Aug 12, 2009

I am having trouble trying to calculate cost for a specific task. I know this is something simple and I am going to kick myself when it gets solved, but I have total brain lock right now! Here is the example of what I am trying to do.

A B C D E F
# of people start finish time man hours labor cost
3 1:35 2:05 :30 1.5 $15.00

I am entering the values in A, B and C, with B & C formatted as TIME. D is calculated by =(C3-B3), but I am lost trying to calculate E and F.

View 2 Replies View Related