Excel 2007 :: How To Use Month Function In VBA

Jun 25, 2013

How to use the Month function in VBA but am not getting the results I expect after reviewing other websites.

I'm running MS Excel 2007.
Simple example:
the worsheet cell, A1 has "5/14/2013" , cell format is DATE

I want to get the month as a number. I know that year(cells(1,1)) results in 2013 so in the immediate window, I try

?month(cells(1,1))
?month(range("A1"))

Both result in Run-time error '13' Type Mismatch.

What am I misunderstanding about the Month function?

View 3 Replies


ADVERTISEMENT

Excel 2007 :: How To Convert Month Number To Month Name

Feb 16, 2012

I am trying to add a dynamic date rang to the heading of a table. I can find the earliest and latest dates, and want to concatenate them in the heading...

January 1 2012 to January 31 2012

The day and year (and the other bits) are easy, but is there an easy way to convert 1 to January, without going through a vlookup.

View 14 Replies View Related

Excel 2007 :: Grouping By Day And Month But Not Year

Nov 4, 2013

I want to count the number of adults and juveniles by 5 day intervals (Augest 1st-5th, 6th-10th, ect). I am currently using =COUNTIFS($A:$A,1,$F:$F,$A27) and manualy labeling the intervals (Aug 1-5 = g, 6-10 = h). I would like to know if there is a easier or faster way to do this. Some of my sheets are 10,000+ entries.

I am also a basic user of Excel so I am not famillar with a lot of the functions.

I'm using Excel 2007

This is a small portion of my data. Age code: 1= Adult, 2= Juvenile, the letters in F are my lables.

Excel 2007ABCDEF1AGE_CODEBANDING_DATEBANDING_DAYBANDING_MONTHBANDING_YEAR2110/31/196331101963y3110/31/196131101961y4111/1/19611111961y5111/1/19651111965y6111/3/19603111960y7111/5/19645111964z8111/5/19645111964z9111/5/19655111965z10111/5/19655111965z11111/6/19626111962z12111/8/19608111960z13111/8/19608111960z14111/11/196011111960aa15211/15/198115111981ab16111/18/201218112012ab17111/19/196419111964ac18111/21/196221111962ac19111/21/196521111965ac20211/24/200224112002ad21111/28/196128111961ad22112/2/19622121962ae23112/3/19613121961aeSheet1

View 8 Replies View Related

Excel 2007 :: Use Of Month Names In Entering Date Through VBA

Jun 26, 2013

In the workbook the sheet names are month names e.g. july,august,September etc and 1st of each month is to be entered in a cell in each the sheets. By some trial and error I wrote this macro

VB:
Sub test()
Dim j As Integer, monthnr As Long, monthname As String
For j = 1 To Worksheets.Count

[Code]....

This worked in July sheet it is written as 7/1/2013 and in august sheet it is 8/1/2013 etc Then I shortened the macro like thlis

VB:
Sub test()
Dim dte As Date
dte = "july" & "/1/2013"
Range("A1") = dte
End Sub

It worked. Even if I use shortened 3 letter form of month like "Jul" or "aug" then also it works

But if type on the spreadsheet itself
="july"/1/2013
It Gives value error.

Perhaps it works only in vba and not spreadsheet.

I accept nobody is going to use "july" & "/1/2013" instead of 7/1/2013 But this will be useful if sheet names are month names so that when we write the date we can use sheet names Mine excel 2007 and windows 7.

View 2 Replies View Related

Excel 2007 :: Dates By Month On X-Axis In Horizontal Stacked Bar Chart?

Aug 24, 2012

I am working with the Ganntt chart and horizontal bar charts but can't seem to figure out a way to force the X-Axis to behave properly.

In Excel 2007, I am trying to get the X-Axis to show major units of Months. However, in my chart options I can only change the Y-Axis to be Date/Monthly.

Changing my data layout (from the below) to be a vertical format produces the same problem, just in the other direction.

My data looks as follows:

System
Blocker
Production
Migrataion
Retired

Sys1
1/1/2012
780

Sys2
1/1/2012
400
60
90

Sys3
2/1/2013
30
5
1

The Blocker column is formatted as "No Fill" in order to cover a portion of the time-scale.

My X-Axis displays as random dates throughout the period and all of my data displays properly in terms of the scale on the grid.

What is NOT working is that the dates shown on the X-Axis really need to be based on a Monthly scale instead of the randomly selected dates Excel is using.

20120823.xlsx

I can't seem to find the right combination of options to make that happen or force a scale on the X-Axis.

View 1 Replies View Related

Excel 2007 Net Working Days Function

Jan 6, 2010

I am trying to use the NETWORKDAYS function in excel to calculate the working days for my company. the problem is I m located in UAE and here Saturdays and Fridays are official days off for my company. Now the problem is that the excel have this built in function that Sunday and Saturdays are weekend days. I want to customize the function for my local days off for my company.

View 14 Replies View Related

Excel 2007 :: Calculating IRR Using Rate Function?

Aug 11, 2012

I am using excel 2007. I am trying to calculate the internal rate of return, without creating an array. I figured out that I can use the rate function to give me the same answer as the IRR function if I have one payment stream of say 36 months @ 1000. Where I am an running into trouble is if I have second payment stream of 6 months extension of 1500. Rate # pay 36 amt 75 PV = 5000 FV 500 , How to handle the the last 6 months ?

This is the situation

asset costs is 5000
monthly lease is 75 for 36 months
extension for 6 months is 125
end of lease buyout is 500

what is the internal rate of return without creating an array.

View 4 Replies View Related

Excel 2007 :: Insert Paste Function Into A Cell?

Nov 25, 2011

I'd like to know if it's possible (Excel 2007) to insert a function/button into a cell, which when clicked, will paste whatever is on the clipboard?

You can see a screenshot of my document here, and I'd like to insert a paste funtion in the red circle. Is it possible?

[URL]

View 9 Replies View Related

Excel 2007 :: VLookup Formula With Indirect Function

Mar 19, 2013

Code:
=D5-VLOOKUP($C5,$C$45:$F$80,2,0)

I have formulas such as above in my Worksheet. So the above is in Cell H5

For the Range $C$45:$F$80, I am inserting rows (So moving down the data) and copying data from $C$5:$F$40 as values into the new space in $C$45:$F$80

I am doing the above using a macro, but when I run it I want this

Code:
=D5-VLOOKUP($C5,$C$45:$F$80,2,0)
to stay static, but instead I end up with

[CODE=D5-VLOOKUP($C5,$C$85:$F$120,2,0)[/CODE]

So my Table Array $C$45:$F$80 changes to $C$85:$F$120

How can I keep it as $C$45:$F$80

The other references in the formula seem to stay as I want them.

View 2 Replies View Related

Excel 2007 :: Search Box Function - Return Value / Text Not Location

May 15, 2014

I need code for a search box function, that returns the information recorded in a cell for example, "Barcelona" or "London" etc), instead of the location of the cells.

I will need to narrow it down to search only the information in the following columns:

Sheet2
I2:J10932

I am totally new to VBA coding and have stumbled my way through a few things, but everything I have searched for so far has had at least one error when transposing to Excel.

I am running Excel 2007.

View 3 Replies View Related

Excel 2007 :: NETWORKDAYS Function - How To Include Saturdays As Workdays

Nov 26, 2011

I have never worked on workdays before so I do not know most of the available formula and play around. I googled across and found this one: [URL] .......

Where Bob has given an ARRAY formula.

Following is my layout in A1 to C3 grid (for testing purpose):
Start Date11/1/2011HOLIDAYEnd Date11/30/201111/3/2011NETWORKDAYS2011/22/2011
The formula resides in B3.

Is there any other development in 2007+ versions of Excel which can handle 6 working days in a week?

View 9 Replies View Related

Excel 2007 :: Index And Match Function With Logical Test

Feb 28, 2013

excel 2007. Here is the situation:

I am using the Index and Match function to lookup for two specific criterias in a different worksheet. So far, it is working well, but it gets complicated. I want to look for the criterias in 6 different worksheets based on what a certain column is saying. Here is an example:

A
B
C
D

[Code].....

So, if the continent is Asia in the column A, I want Excel to look in the Asia worksheet for the city and the venue and return me the contact information. Same, if the continent says Europe, I want it to look in the Europe worksheet or the city and the venue and return me the contact information. So on and so forth.

The formula I have at the moment is this:

{=INDEX('Asia'!$1:$1048576;MATCH(B3&C3;'Asia'!D:D&'Asia'!E:E;0);9)}

How do I incorporate the logical test for it to look for the proper worksheet knowing that all my continent worksheet have the same structure?

View 3 Replies View Related

Excel 2007 :: Using INDEX And MATCH Function To Return Header Value

Mar 26, 2013

currently using Excel 2007 with Windows Vista.

I currently have a worksheet where I want to input a date (G2) and a rank value (H2) ranging from 1 to 4. The header value (B1:E1) corresponding to the date (A2:A4) and the rank (B2:B4) should be returned to I2 (currently returns #NA).

Using formula: =INDEX($B$1:$E$1,MATCH(H2,INDEX($B$2:$E$4,MATCH(G2,$A$2:$A$4),)))

which I found under: Find row, find value, then return column heading

However, the above formula does not seem to work with my date order or recurring data values of 1 to 4 over the 3 rows.

The worksheet layout is as follows:

Date

A

B
C
D

Date

Rank

Header

[code]....

The return value under Header should be C.

I have reversed the order of the dates and put sequential numbers in B2:B4 as plug variables and the above formula will return the correct Header value but I need the formula to work with the current date order and repeating rank values of 1 to 4 in B2:B4. Do not wish to use VBA.

View 2 Replies View Related

Excel 2007 :: Compile Error / Sub Or Function Not Defined - Even After Solver Has Been Referenced

May 15, 2014

I get this error : Compile error : Sub or Function not defined. I found out that this might be caused by the solver not being referenced. But, this is fixed now but I still get the same error message.

I'm using Excel 2007 - Windows.

Here is the code :

Sub Macro1()
Dim i As Integer
Dim j As Integer
j = 4
For i = 1 To 4000
If ActiveSheet.Cell(i, 12).Value = 1 Then
ActiveSheet.Cell(j, 15).Value = ActiveSheet.Cell(i, 2)

[code].....

View 2 Replies View Related

Excel 2003 :: Upgraded To 2007 And Worksheet Change Function Does Not Work

Oct 10, 2011

I recently upgraded from Excel 2003 to 2007, and the worksheet change procedure that i have embedded in my worksheet no longer fires when the criteria are met. If and if I fix it to work in 2007, will it still work in 2003?

Here is my procedure:

Private Sub Worksheet_Change(ByVal Target As Range)
Dim rngCell As Excel.Range
If Not Intersect(Target, Range("C19:R19")) Is Nothing Then
For Each rngCell In Intersect(Target, Range("C19:R19"))
If rngCell.Value = "BLACK" Then
MsgBox "Please select a shading style", , "Shading Style Required"
End If
Next rngCell
End If
End Sub

View 2 Replies View Related

Excel 2007 :: Mouse Wheel Scroll Function Doesn't Work

Feb 8, 2012

I'm using Excel 2007. When I try to scroll with the mouse wheel, it doesn't do anything. If I hold down the control key and scroll with the mouse, it zooms in and out. So that works fine, but I can't do the basic scrolling up and down the document with the mouse wheel. There is no "Tools, Options" menu in 2007 so I don't even know where to find this type of option. The options available from the Office button are completely different.

View 4 Replies View Related

Excel 2007 :: Determining / Counting Number Of Values Used In SUMIF / SUMPRODUCT Function

Aug 2, 2014

I am using Office/Excel 2007 and Windows 8

I want to determine the number of values SUMIF/SUMPRODUCT functions used/checked to arrive at the answer, i.e. 95 for row 2 and 116 for row 3. A function that can give a 3 and 2 respectively.

Example:

Results for Row #2 gives: 95 with 3 values picked up under "Rate"

Results for Row #3 gives: 116 with 2 values though three places were checked up under "Rate"

How can I count the number of these values referencing at the "Rate" like in the functions used.

I managed to use SUMIF/SUMPRODUCT functions to calculate totals based on "Rate" in row one.

I tried COUNTIF function, but allows only field/heading.

A
B
C
D
E
F
G

[Code] ..........

results for each formula used

95 formula: =SUMIF(B$1:G$1,B$1,B2:G2)

95 formula: =SUMPRODUCT((B$1:G$1=B$1)*(B2:G2))

3 formula: =COUNTIF(B1:G2,B1)

View 9 Replies View Related

Using Month Function To Obtain Month And Copy It To Next Empty Column

Apr 4, 2013

I am working in a spreadsheet that contains a bunch of data, it is not limited, and varies. It has some fiels such as: name, date of birth, address, and others. I am interested in creating a column with only the month digit of the date of birth for each row.

I have been working with some code, I am not quite sure how to continue. The following table would be a example that I have of the data, it has only to entry in the column of Date of Birth, but my data range will always vary. I want to get the month and past it in the next cell that is available in this case would be column c or 3... The worksheet name is REP.

VB:

Dim Cell As Range
' 1st cell with the posting date
Set Cell = Range("A2")

Do While Not IsEmpty(Cell)
If Cell = "Date" Then

[Code] .....

View 5 Replies View Related

Function To Fill All Days Of Month To End Of Month Based On Workdays

May 1, 2006

I would like to create a monthly inventory, based on workdays (Monday - Friday)Myrna Larson has a formula that I would like to use with the workday function, but I don't know how to combine them.

=IF(A1="",A1,IF(MONTH(A1+1)=MONTH(A1),A1+1,""))+ = workday

to fit on the page, I need the dates to be from the 1st to the 15th, and 16th to the 31st. I am not sure how to write this either.

View 11 Replies View Related

Function To Fill All Days Of Month To End Of Month

Oct 2, 2005

function in a spreadsheet that will list all of the days in
a given month automaticaly with the entry of the 1st of the month only.

Ex;
10/01/05 entered dated
10/02/05 auto fill
10/03/05 "
. "
. "
10/31/05 end of auto fill

I would like the function to stop filling dates at end of the month even for shorted months such as Feb.

View 10 Replies View Related

2007 Right Function With Embeded Find Function

Mar 26, 2009

I have a range of cells, for this example I will use 2.

Cell E17 = 77/170
Cell E18 = 8/9

Using the following formula: =SUM(RIGHT(E17,FIND("/",E17)))+SUM(RIGHT(E18,FIND("/",E18)))

This bring back an #VALUE! Error as the second part of the formula keeps picking up "/9" however the first part works fine, displaying "170"

Now if I use:
=SUM(RIGHT(E17,FIND("/",E17)))+SUM(RIGHT(E18,FIND("/",E18)-1))
It all works. The problem is that I need this to be automatic using the above way means having to add a "-1" to every formula for a cell with only 1 char to be added.

Using the formula:
=SUM(RIGHT(E17,FIND("/",E17)-1))+SUM(RIGHT(E18,FIND("/",E18)-1)).....

View 2 Replies View Related

COUNTIF Function Per Month

Mar 12, 2007

I have a table in which we track our daily issues.. A1 - A6

Resource/Subject/Date/Time Of Failure/Escalated/Tech Int

I want to be able to count the amount of escalations we have per month...
We just enter a Y or N for the escalation field.

I'm not great with Excel and can do a count with the COUNTIF but don't know how to separate my results so that the count is done per month..

Can someone point me in the right direction?

*EDIT* Also my date format is as follow's 04-Jan-07. Should I change that to make it easier to calculate the results?

View 9 Replies View Related

Using Filter Function To Select More Than One Month

Feb 19, 2014

I currently have a column of data by month for the years 2013 to 2025. I want to show only dec, jan and feb of each year. I am currently using the filter function but I can only select one month at a time.

View 2 Replies View Related

Text Conversion Of MONTH Does Not Function?

Dec 2, 2013

I entered a pretty easy formula to pull the month from a date:

=MONTH(C23)

, where C23 = 12/11/2013. This returns the expected output of 12.

However, when I convert it to text:

=TEXT(MONTH(C23),"mmm"))

It outputs January instead of December. I am so confused, why would Excel 2010 return bogus output in this regard? I mean, I can use the =MONTH formula.

View 5 Replies View Related

Countifs With Month And Year Function

Feb 3, 2009

I have a column titled "Start Date", "Month/Year", &"Total". I want to count the number of dates that appeared in the "start date" column that have the same month and year of the "month/year" column. That count should be in the total count. For ex, I want the first total (april 2008) to be 1, the second (may 2008) to be 1, and so on. I tried using countifs month and year of the start date is the month and year of the month/year column. Not working.

Here's my data: ....

View 9 Replies View Related

Sum Numbers For Each Month By Sumif Function

May 4, 2007

Column A have random dates and column B have numbers. How can sum numbers for each month By sumif function?

View 6 Replies View Related

Financial Model (formula To Equally Distribute Revenue Either Over The Next 1 Month, 2 Month Or 3 Month Period Depending On Size Of The Deal)

Dec 23, 2008

I m trying to write a formula for my financial model. If anyone can take a stab at a solution. I'm trying to write a formula that will equally distribute revenue either over the next 1 month, 2 month or 3 month period depending on size of the deal.

Details:
Sales will fit in 1 of 3 categories. Less than 25k; between 25k & 100k; greater than 100k.

- if under $25K, recognize in next month (month N+ 1)
- $25K-100K, recognize in two equal parts in months N + 1 and N + 2
- over $100K, recognize in three equal parts over 3 months
N + 1, N + 2, N + 3 ...

View 4 Replies View Related

Date Function Query (calculate The Last Day Of The Month)

Nov 12, 2008

I am using a formula to calculate the last day of the month, using any date of the month in a worksheet in cell A13, this cell is also linked to another worksheet to pick up a date, using the ISBLANK function to prevent a dummy date entry appearing if the field in the linked ASHBY RISE worksheet is blank
=IF(ISBLANK('ASHBY RISE'!$C$5),"",'ASHBY RISE'!$C$5)

The last day of the month function is shown below
=DATE(YEAR(A13),MONTH(A13)+1,0)

This works fine if there is a date in A13, but returns a #VALUE! error if cell A13 is blank. I have tried using the ISBLANK function, but I am still getting the #VALUE! error. Of course I may have the sysntax incorrect.

View 4 Replies View Related

SUM Function (count How Many Packages Each Processor Does Per Month)

Mar 30, 2009

A4 is Date Assigned (MM/DD/YY) on the Activity sheet
S4 is the month assigned which I extracted from A1 (January, February, etc.)
J4 is the name of the processor

On a separate sheet I'm trying to count how many packages each processor does per month. On this sheet I've entered (as an array) =SUM(IF(Activity!$J$4:$J$390="ProcessorA",IF(Activity!$S$4:$S$390=$A$4,1,0))).
This doesn't work. However, if I delete the formula and formatting from S4 and manually type in the name of the month in each cell in S column it does work. So, how should I be formatting Column S and the the month column on the other worksheet so that the formula will work? I'm using Excel 2000 and have attached a mini sample.

View 3 Replies View Related

Function To Find Days In Specific Month

Jan 30, 2010

Can Anybody help me with a function that will arange all days from January acorrdingly with the year 2010. I am attacing a sample file to make it clear. I need the function to Check which month is in Cell H1 and arrange the days accordingly to the month and the year.

In my example the code must change the Cell values Like this: ...

View 9 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved