Formula To Calculate Pilot Duty Time In 24hrs
Jun 8, 2014
I am a flight dispatcher who is having difficulty with a Flight Duty Period tracking sheet. I need a formula which gives me the total duty time of a pilot in one single day, which is calculated by using the DUTY START time of first flight and DUTY END time of last flight in the same day.
I have attached the excel file. Please download file and open the FDP tab from the file and goto cell AI7.
Basically I need a formula in cell AI7, which checks up the date on column D and selects a date range of the same date in column D (in this case D7:D8) and then give the difference between the Duty Time START of FIRST FLIGHT (column AF) and Duty Time END of the LAST FLIGHT (column AG).
Ex: 12:05-9:20 =2:45
Please note that I want the formula to automatically check the cells in column D for the dates, not manually select the dates, because pilots do more than one flight per day sometimes and it is never same. Formula than should be able to calculate the difference between the largest number in column AG and lowest number in column AF in the same date range mentioned before.
Uneven number of flights on different days is making it complicated for me.
View 2 Replies
ADVERTISEMENT
Jun 2, 2006
I'm developing a local timesheet userform application and want to capture times which may be greater than 24hrs using a textbox/spinbutton pairing.
I've managed to pair up and work with times up to 24hrs but the output always resets after 23:55.
I've also tried formatting the output as "[h]:mm" but without success.
Private Sub sbDTime_SpinUp()
With ctrl2
If .Text = vbNullString Then
.Text = Format(TimeSerial(0, 5, 0), "hh:mm")
Else
.Text = Format(TimeValue(.Text) + 5, "hh:mm")
End If
End With
End Sub
Private Sub sbDTime_SpinDown()
With ctrl2
If .Text = vbNullString Then
.Text = Format(TimeSerial(0, 5, 0), "hh:mm")
Else
.Text = Format(TimeValue(.Text) + 5, "hh:mm")
End If
End With
End Sub
View 9 Replies
View Related
Apr 27, 2014
Formula to calculate time allotted minus time used and show the difference in hour and minute.
View 1 Replies
View Related
Jul 1, 2012
I have a problem here:
Eg.
A B C D E F G H I
1 8 pm 9 pm 10 pm 11 pm 12 am 1 am 2 am
2 8 pm 11 pm
3 8 pm 2 am
I typed a formula : =if(and(c$1>=$a2,d$1
View 4 Replies
View Related
Aug 13, 2012
Below is my data
Complexity Type
Name
1
2
3
4
5
6
7
Ali,Shaheen Sultan
8
34
34
6
0
0
0
Budati,Manoj Kumar
7
18
18
12
6
0
0
Based on above data if The Column heading is 1 then it needs to go to the below data and multiply by that value and at the end should give me the total for the person. note that the total time is captured in a different sheet.
Complexity
Times Complexity 1
1
1.00
2
1.41
3
2.03
4
2.92
5
3.19
6
4.10
7
4.65
View 6 Replies
View Related
Feb 24, 2014
I want to calculate time left in hours from today to target date. The result should be exclude weekend/holidays and non-working hours too.
View 3 Replies
View Related
Mar 20, 2007
i have a formula on my worksheet that tells me how many hours break i have between my finish time on say monday and my start time on tuesday, now..ive added another column but in this one i need it show either a 9 or 11. so if i have lets say 10.75 hours break or less between duty then i need the cell to show 9 however if i have 11 or more than 11 i need it to show 11. here is the code that i have at the moment
=IF(AND(ISBLANK(D10),ISBLANK(E10)),"",IF(24*(IF(E10>D11,D11+1-E10,D11-E10))=0,24,24*(IF(E10>D11,D11+1-E10,D11-E10))))
View 9 Replies
View Related
Feb 16, 2010
I have been asked to make some ammendements to a workbook currently in use.
I have to calculate elapsed time, and my formula is giving me odd results. I have a start time (cell B5), and an end time (cell F5). The formula being used was =IF(F5>0,((F5-B5)*24)) which gave the correct result. The cell is formatted as general. It didn't alot for the situation where the end time has not happened yet.
I changed the formula to =IF(F5>0,((F5-B5)*24),(K5-B5)*24) where cell K5 is the current time. The results are coming out with 6 - 9 decimal places. It makes no sense as I've tried setting the times to be exactly 24 or 48 hours to the minute. I've also tried replacing K5 in the formula to now(),
View 12 Replies
View Related
Aug 23, 2012
I want to calculate labour rates as follows:
06:00 to 18:00 std rate $10
18:00 to 06:00 night shift rate $15
I want to be able to type in the hours worked e.g. 11:00 to 19:00 and would expect 7hrs at $10 and 1 hr at $15.
View 1 Replies
View Related
Feb 17, 2008
I'm working in excel2007:
I want to write a generic formula to calculate the difference of time between cells, the first being a real data point, such as
6/22/2007 8:53
minus a generic constant term using the same date and a given time, 8:30.
So, what I need is something like this:
6/22/2007 8:53 – (same mm/dd/yy @ 8:30)
6/22/2007 12:29 – (same mm/dd/yy @ 8:30)
6/25/2007 11:19 – (same mm/dd/yy @ 8:30)
View 9 Replies
View Related
Aug 7, 2007
attached is an example of a timesheet we use.
now after lengthy discussions the comany say its not 'in their interest' to use acess so i'm stuck with excel on this one.
I need to sum a column on many critiera, which i feel maybe a job for the trusty old =SUMPRODUCT. But thing is i need to sum a column based on a date range, Rate, Day.
I have manually typed in the number i think it should produce but as far as formulas go
1st off need to calcualte date range, which is situated on the top of the spreadsheet.
2nd some how tell the formula that Normal overtime is either classed as rate 1 Saturdays classed as 1.5 and sundays and bank holidays classed as 2.
View 3 Replies
View Related
Feb 12, 2010
I am using the below formula to distinctly count the number of customers that match the criteria that I have in Cells C7 and B10. The data is in a separate worksheet, that I am showing Named Detail of which will be changing on a monthly basis, so a pivot table does not want to be used. The detail data ranges from row 7-40,000, and the file is currently 8610KB's, and can potentially grow.
=SUM(IF(FREQUENCY(IF(Detail!$A$7:$A$40000=C$7,IF(Detail!$B$7:$B$40000=$B10,IF(Detail!$D$7:$D$40000<> "",MATCH(Detail!$D$7:$D$40000,Detail!$D$7:$D$40000,0)))),ROW(Cust)-MIN(ROW(Detail!$D$7:$D$40000))+1),1))
This formula works but takes an excessive amount of time for one caluclation, and I need this for multiple column and row critera. So, can this calculation be changed in order to get the same result with faster calculation time? I am using Excel 2003.
View 6 Replies
View Related
Jan 28, 2008
I have created a fairly large spreadsheet (10Mb) to fully account for pilots hours in accordance with the current legislation laid down in CAP 371. It covers just about every aspect and I am delighted with it - BUT - I would very much like it to open on todays date?
Basically, each pilot has a sheet where he/she enters only duty times and the hours that are flown and the sheet works everything else out. At the moment I have it working well for 10 pilots but adding more would be easy. On top of this sheet 11 is a summary for the Chief Pilot (Me) to see exactly who is doing what in terms of hours, duty times etc etc. Obviously the summary is just a matter of moving the information from the pilots sheets on to the summary - this works well. But again it would be a blessing in disguise if on opening or even if the computers are left on they opened/stayed on todays date.
View 9 Replies
View Related
Dec 2, 2008
On my spreadsheet i have a bunch of variables:
A1 = Arrival time at Checkpoint 1 - 5:53:08
A2 = Time to destination from Checkpoint 1 - 1:10:18
B1 = Arrival time at Checkpoint 2 - 6:00:56
B2 = Time to destination from Checkpoint - 1:02:30
C1 = Total distance from Start - 2.83
C2 = Arrival Time at Destination - =SUM(A1,A2)
D1 = Speed determined from the other variables
D1 is SUPPOSED to equal 25.00
It also is where I am stumped!!
Not only can I not figure out the math but also how to format the function to get the right answer.
ps: Arrival Time at Destination is only included in case it would be useful to find the answer!
View 7 Replies
View Related
Nov 18, 2009
I have a range of data in a spreadsheet that has entry dates. To one side I have a cell that =today()
What I want to do is where the entry date is in my range of data is insert a column that will tell me "yes" if the entry date =today()-1
View 8 Replies
View Related
Apr 24, 2012
I'm a pilot and have to keep a dreaded logbook of each flight and do month totals.
My log book looks like this:
Date From To Hrs
22/07/11 LHR CDG 1.3
22/07/11 CDG LHR 1.3
23/07/11 LHR FCO 1.3
23/07/11 FCO LHR 1.3
etc
I've been looking for a formula where by I can sum the total hours per month so that it looks like this:
Total hrs flown June 2011: (clever lookup formula goes here)
Total hrs flown July 2011: (clever lookup formula goes here)
I've tried vlookup but can't seem to get anything to work.
View 4 Replies
View Related
Mar 8, 2014
production01.png
I am trying to figure a way to search for a cell that has a specific date and time range. There are several cell titles pending on the activity. I want to find a cell that has a time ** 7:30-15:30 , 15:31-17:30, 17:31-20:30. The end result is to calculate the activity between those time periods based on the data cells.
Example
If the date searched time field ** the activity ranges is 1635 I need to split the time and credit the activity time in the 730-1530 time and the rest on the 15:31-17:30 time
I have been able to do it on a single labor group based on time alone, but when I try to add the DATE to it my numbers go null. Eventually i will need to add 11 labor groups daily for weeks at a time .
Excel 2007
View 3 Replies
View Related
Aug 28, 2009
I am wanting to calculate the the processing time for an order that takes place within normal business hours and workweek. A normal day is from 8:00 to 5:00 If a task is started at 2:00 PM Monday and finished at 10:00 AM Tuesday then the result should be 5 hours as I do not want to include any time outside of normal hours. I can figure out how to subtract dates and times but not how to bridge a day(s). My data is somewhat flexible as I have not started the project yet. I can use separate cells for the times and dates or have two cells that use both incorporate the date and time (8/27/09 2:00 PM) for start and end time or any other idea.
View 6 Replies
View Related
Jun 19, 2014
I have a userform that time stamps on my userform as soon as i open the form, is there a way that when I submit, that the amount of time that I was on the call to be put in my column on my worksheet as minutes?
View 2 Replies
View Related
May 17, 2014
I found this formula similar to other formula
NETWORKDAYS(D1,F1)-1)*"18:00"-"9:00")+IF(NETWORKDAYS(F1,F1),MEDIAN(G1,"9:00","18:00"),"18:00")-MEDIAN(NETWORKDAYS(D1,D1)*E1,"9:00","18:00")
By the way ....D1 = start Date
F1 = End Date
E1 = start Time
G1 = End Time
It's GREAT! But now I need include time from 6:00 a. m. to 10:00 p. m. (I already modified your formula:
(NETWORKDAYS(D1,F1)-1)*("22:00"-"6:00")+IF(NETWORKDAYS(F1,F1),MEDIAN(G1,"6:00","22:00"),"22:00")-MEDIAN(NETWORKDAYS(D1,D1)*E1,"6:00","22:00")) because are regular working hours in Colombia but:
1. All the days (Monday to Saturday) are working days
2. I just want to calculate the time in shifts, I don't specify the start date and end date. Example: 8:00 p.m. to 11:00 p.m. Result: 2 hours, because 1 hour is after 10:00 p.m.
This are two different options, so I need two separate formulas.
View 10 Replies
View Related
May 3, 2008
This may be a bit vague but here goes.
I have to calculate the difference between the start time and end time of a job. The only catch is, how can I avoid calculating "out of hours" time. So, if a job goes from 9am to 9am the next day, I want it to avoid calculating between the hours of 23:30 and 03:30.
Another example is if a job goes from 02:00 to 04:00, I want it to avoid the tim between 02:00 and 03:00.
If there is a difference in days, so the job goes overnight, how do I take that into consideration also.
View 9 Replies
View Related
Aug 16, 2008
I've got a time difference from 8:00AM - 12:30PM as 4.30 I'm trying to get the minutes, .30, converted into a 6 minute increment, .5. Is it possible to do this and if so how would it be done? Below is a chart of how the time is converted from 6 minutes increments into decimal form.
6 = 0.1 36 = 0.6
12 = 0.2 42 = 0.7
18 = 0.3 48 = 0.8
24 = 0.4 54 = 0.9
30 = 0.5 60 = 1.0
View 5 Replies
View Related
Aug 11, 2006
I'm trying to devise a formula to produce "days in inventory" based on the following data:
Date In
Date Out (which may be blank if cargo still here)
Todays Date
Days in Whse (which is the formula I can't figure out!)
It needs to work like this, date out - date in, unless date out is null. If date out is null, the result should be calculated based off of todays date - date in.
View 3 Replies
View Related
Feb 7, 2014
the vendor has a 21 hr working window; start from 7am and goes until 4am; Mon to Fri.
Here is a scenario:
- i request for a product information from a vendor on 3-Feb-14 8:00am (Monday)
- he replies with all of the product info on 6-Feb-14 12:00pm (Thursday)
can you find the time in above scenario consideration the working window?
Here is another scenario:
- i request for a product information from a vendor on 6-Feb-14 8:00am (Thursday)
- he replies with all of the product info on 11-Feb-14 12:00pm (Tuesday)
- Sat & Sun are days off but keep in mind that my Friday shift ends on sat at 4am so the networdays formula wont work.
View 2 Replies
View Related
Feb 5, 2009
I need to calculate the time spent replying to my inquiries: I log the time I receive my inquiry as: 06/02/2009 09:23:00 in column A. I log the time I send my reply as: 07/02/2009 07:23 in column B. In column C, I need to put the Formula that will return the following result: 0 days 22.0 hours.
View 5 Replies
View Related
Aug 12, 2009
WHen I was a beginner at Excel, I came up with the following formula to calculate the time difference between two "time" values. Since I was too lazy to add a ":" between my hour and minute, I had decided to simply enter the start (column B) and end time (column C) as a military time (e.g., 0100, 1230, 1500, 1930, 2300, 2359). The following formula would be in Column D.
=IF(C7
View 9 Replies
View Related
Aug 6, 2014
how to find the average times of two different sets of groups. There are the baseline times and intervention times. Both groups have three subtopics: Time Fell Asleep, Woke Up, and Duration (how many hours I slept). I am not sure how to find the average of each subtopic. Here are the times....
Baseline times:
Fell AsleepWoke UpDuration
2:30 AM10:00 AM7:30 hrs
4:30 AM12:30 PM8:00 hrs
[Code]....
View 3 Replies
View Related
Jun 23, 2009
I have a problem with a time card i am producing. I want to count hours and minutes worked and carry forward any surplus or deficit into the next week. I can do it if the hours do not total more than 24. I have attached the file and it is formatted in 1904 format.
View 2 Replies
View Related
Dec 12, 2009
I am staring at this excel spreadsheet blankly ... I am at a loss as to how to accomplish the detailed analasys but simple math this spreadsheet reequires.
The data consists of three columns pasted from a report that is exported as a .csv:
B
Code
C
Start Time
D
End Time
The following analyses must be made on each row:
1. determine if the start time falls within the scheduled shift
View 9 Replies
View Related
Jul 14, 2010
I need to compute the total time in a userform.
I have a userform where:
1. User enters a start and end time Start1, End1 (23:00, 01:00)
2. The time difference is calculated and displayed in Total1 (2:00)
3. User enters Start2, End2 (22:00, 22:50)
4. Time difference calculated - display in Total2 (00:50)
5. Grand total of Total1, Total2 is displayed in GrandTotal (2:50)
The user will input the times as 0000 but I need to convert the entry into a time format. (User enters 1235 - I need it to covert to 12:35)
View 5 Replies
View Related